Search
You searched for:
Start Over
History
Remove constraint History
Subject
Irrigation projects
Remove constraint Subject: Irrigation projects
« Previous | 2,531 - 2,540 of 2,557 | Next »
Search Results
-
P12-201-4472 NA Klamath Project, OR-CA. Another view of the PP 'E' bridge, west side. Three (3) short piling have been driven to specs.; two center piling are driven to 31' depth; November 22, 1977; USBR ...
Citation -
P12-201-4473 NA Klamath Project, OR-CA. Overall view of PP E and PP EE. Taken south of flume for center canal; November 23, 1977; USBR photo by D.J. Kline
Citation -
P12-201-4474 NA Klamath Project, OR-CA. View of PP 'E' bridge looking from west to east. Piling far right driven to 40' depth. Remaining piling are in to a depth of 31'. Note: Center pile caught fire due ...
Citation -
P12-201-4475 NA Klamath Project, OR-CA. Spoils removed from east side of PP 'E' outlet transition for PP 'E' bridge piling. Material was removed by backhoe due to rock; November 23, 1977; USBR photo by ...
Citation -
P12-201-4476 NA Klamath Project, OR-CA. Case 580C Extend-a-Hoe excavating on east side of PP 'E' outlet transition for PP 'E' bridge piling. Note: Large rock in foreground removed from excavation; November ...
Citation -
2536. [Image] "E" Canal, plain 2 1/2" concrete lining placed in 1924
KP-1735-R2 - Klamath Project. Picture at Sta. 59-10 of patched joint cracked through. Joints originally edged have opened considerably. Lining is badly fractured at several points by frost heave, with ...Citation -
2537. [Image] N-12-a Lateral and 101-A-1 Drain
KP-1098-R2 - Klamath Project - Tule Lake Division - Modoc Unit; Excavation on the construction of the lateral is proceeding by use of an Osgood dragline. The west bank seen in the left of the picture ...Citation -
2538. [Image] Gerber Dam - Region 2's underwater inspection team going through last-minute preparation before under-ice diving at Gerber Dam
P12-200-2846NA Gerber Dam, Klamath Project, Oregon-California. Team members from left to right: G. W. Fuller, civil engineer; J. L. Andrews, structural engineer; B. H. Carter, geologist; T. J. Spicher, ...Citation -
2539. [Image] Klamath Falls, Oregon - Special recognition of 50th anniversary of constructing Link River Dam
P12-200-2903NA - Klamath Project - Klamath Falls, Oregon. Special recognition of 50th anniversary of constructing Link River Dam and highly successful cooperation in operating the Dam and Reservoir. View ...Citation -
2540. [Image] Klamath Straits Drain Enlargement, Lower Klamath Lake Division - Specs. 200C-922, Patterson Construction Company, Contractor
P-12-200-4153NA Klamath Project - Oregon-California. Placing 8, 6, and 4-inch perforated plastic pipe with drain guard approximately 6 ft. deep, 3 ft. inside our right of way between Sta. 210 and 267, ...Citation