2261. [Image] "M" Canal Lining, Station 131, looking Northeast - Placing concrete lining with completed panels on each side
KP-1509-R2 - Klamath Project; Using Fresno float (steel) after bull float; Time approximately 1:44 P. M., July 18, 1947; Stacy, contractor; Photo by H. W. SextonCitation -
KP-1510-R2 - Klamath Project. Note Fordson tractor with front end loader just dumping aggregate into batch plant hopper. Crane, batch plant, mixer, etc., located on north and west side of canal. Fordson ...
Citation -
KP-1511-R2 - Klamath Project. Steel in place, completed panels shown, screeds in place, steel men working. Paper is used to prevent curing compound getting on steel. Man with hose, who wets down subgrade ...
Citation -
KP-1532-R2 - Klamath Project. Picture taken after a block of compacted earth was removed from between the shrinkage cracks in the preceding picture. Note smaller cracks in earth below removed block; August ...
Citation -
2265. [Image] "B" Canal check structure
Roll 2 No. 6 - Klamath Project. Note that horizontal construction joint is badly weathered. As in "A" Canal concrete lining shown in previous pictures, horizontal joint is badly weathered indicating the ...Citation -
2266. [Image] Klamath Project Lost River Diversion Channel Enlargement
KP-3 - Klamath Project Lost River Diversion Channel Enlargement. Looking East along Lost River Diversion Channel. Bridge in foreground (at Station 19) has not yet been extended to permit excavation of ...Citation -
2267. [Image] Lost River Diversion Channel Enlargement
KP-5 - Klamath Project. Looking East at C-Canal Flume Crossing, (Station 78) dismantled preparatory to constructing new piers, State Highway bridge in background, 1-B drain on right of Channel. Section ...Citation -
2268. [Image] Lost River Diversion Channel Enlargement
KP-8 - Klamath Project. Lost River Diversion Channel Enlargement. Miller Hill Pumping Station 217 of Lost River Diversion Channel looking East. C-4-e lateral in foreground; October 20, 1949; Photo ...Citation -
2269. [Image] Lost River Diversion Channel Enlargement
KP-12 - Klamath Project. Lost River Diversion Channel, Klamath River End. Compacted embankment of enlarged section has been constructed, but channel excavation has not yet started. Farm bridge in foreground ...Citation -
KP-1284-R2 - Klamath Project - Lost River below Boundary Dam Site. Looking downstream toward 32/15. Shadow on left side of picture due to high ridge on west side of river. Time 2:30 P. M.; December ...