Search
You searched for:
Start Over
Photos
Remove constraint Photos
Subject
Irrigation projects
Remove constraint Subject: Irrigation projects
« Previous | 11 - 20 of 2,850 | Next »
Search Results
-
KP-1529-R2 - Klamath Project. Panorama with the photo KP-1528-R2 - Klamath Project; August 20, 1947; Photo by D.H. Gross
Citation -
12. [Image] CLEAR LAKE CHANNEL
KP-2605-R2-Klamath Project - CLEAR LAKE CHANNEL. Second blast test by propagation method near Sta. 95+00 (photo slightly premature); July 26, 1961; Photo by L. McAnultyCitation -
13. [Image] CLEAR LAKE CHANNEL
KP-2606-R2-Klamath Project - CLEAR LAKE CHANNEL. Second blast test by propagation method near Sta. 95+00 (photo slightly premature); July 26, 1961; Photo by L. McAnultyCitation -
14. [Image] Pumping Plant "D" - Unloading a new 700 HP motor
KP-1877 - Klamath Project. Pumping Plant "D". Photo showing the unloading of a new 700 HP motor; November 22, 1949; Photo by Andrew M. BergloffCitation -
15. [Image] N-16 Lateral - Lower Cost Canal Lining
KP-1882 - Klamath Project. N-16 Lateral. Lower Cost Canal Lining. Photo shows channel in distance with George L. Browning in the foreground painting the edge of the first asphalt strip with a solvent ...Citation -
16. [Image] A-3-a Lateral - Looking upstream from a bridge
KP-2258-R2 - Klamath Project--A-3-a Lateral. (See also Photo No. KP-2257-R2 looking downstream from same bridge.) Banks not pastured. Ditch is in good condition; August 1954; Photo by C. O. WamstadCitation -
KP-2270-R2 - Klamath Project--Tule Lake Division. (See also Photo No. KP-2268-R2); April 1, 1955; Photo by Luther McAnulty
Citation -
P12-201-4480 NA Klamath Project, OR-CA. Photo shows damaged area of PP 'E' outlet transition west wall. Photo taken prior to pile driving operations. Looking down; November 15, 1977; USBR photo by D.J. ...
Citation -
P12-201-4600NA Klamath Project, OR-CA. S-17a Drain -- Photo shows S-17a Drain excavation from Sta ±80+00 looking south. Photo taken in an area of discrepancy of cut alignments. Results: Follow staking ...
Citation -
20. [Image] Abe Boehm Claim (KSD Enlargement, Phase 1, Specs. 200C-0922, Patterson Construction, Inc., Contractor)
P12-201-4636NA Klamath Project, OR-CA. Photo shows outlet of field drain put in by Patterson Construction, Inc., for Abe Boehm. Photo taken from Township Road looking north; April 5, 1979; USBR photo ...Citation