Search
You searched for:
Start Over
Photos
Remove constraint Photos
Subject
Irrigation projects
Remove constraint Subject: Irrigation projects
« Previous | 1,591 - 1,600 of 2,850 | Next »
Search Results
-
P12-201-4484 NA Klamath Project, OR-CA. Overall view downstream of PP 'FF'. Note concrete placement operation; Nov. 2, 1977; USBR photo by D.J. Kline
Citation -
P12-201-4485 NA Klamath Project, OR-CA. View of PP 'FF' inlet to siphon transition looking from outlet structure west; November 2, 1977; USBR photo by D.J. Kline
Citation -
P12-201-4486 NA Klamath Project, OR-CA. Placement of PP 'FF' inlet transition to siphon; November 2, 1977; USBR photo by D.J. Kline
Citation -
P12-201-4488 NA Klamath Project, OR-CA. Picture taken of RHC 1/4" steel plate to be used as a bulkhead in CMP "84" hydrostatic test. This one to be inserted in round CMP to concrete transition west of ...
Citation -
P12-201-4489 NA Klamath Project, OR-CA. Second piece of RCP a 16' tangent is lowered into pipe trench by both 3500 Manitowo and 35 ton Manitowol. Two (2) cranes were required because the 3500 had only ...
Citation -
P12-201-4490 NA Klamath Project, OR-CA. Lowering of 1st section of RCP into trench; December 2, 1977; USBR photo by D.J. Kline
Citation -
P12-201-4491 NA Klamath Project, OR-CA. First sections of 24" RCP arrived today. Here a 15° mitre joint is being lifted off lowboy by 3500 Manitowoc; Dec. 2, 1977; USBR photo by D.J. Kline
Citation -
P12-201-4492 NA Klamath Project, OR-CA. Template being used over screeding in placing bedding material for 84" RCP; December 2, 1977; USBR photo by D.J. Kline
Citation -
P12-201-4493 NA Klamath Project, OR-CA. Putting in screeding and 84" RCP in preparation for pipe laying operation; Dec. 2, 1977; USBR photo by D.J. Kline
Citation -
P12-201-4494 NA Klamath Project, OR-CA. Preparation of 84" RCP pipe bedding. Total depth 2' consisting of 1 to 1.5 foot of 3" minus rock and 1' to 6" of 3/4 minus material with a large percentage of fines. ...
Citation