P12-200-2850NA Gerber Dam, Klamath Project, Oregon-California. Four members of regional diving team returning to vehicles with diving gear after completion of trashrack inspection. Six inches of snow ...
Citation -
P12-200-2851NA Pumping Plant F, Klamath Project, Oregon-California. Float well in pump chamber of Unit 1 (left) was measured for installation of float stop; February 16, 1966; Bureau of Reclamation ...
Citation -
P12-200-2852NA Pumping Plant F, Klamath Project, Oregon-California. Divers entering Unit 1 from access hole in trashrack deck to determine condition of float well pipe and take measurements for fabrication ...
Citation -
P12-200-2853NA Pumping Plant F, Klamath Project, Oregon-California. Visibility in pump chamber was zero even with light shown. Left to right: B. H. Carter, T. E. Morris, T. J. Spicher, J. L. Andrews; ...
Citation -
1285. [Image] Pumping Plant F - Divers emerging from trashrack deck access hole to Unit 1 after measuring float well pipe
P12-200-2854NA Pumping Plant F, Klamath Project, Oregon-California. The five men shown are members of the Regional Diving Team. Left to right: B. H. Carter, T. E. Morris, T. J. Spicher, J. L. Andrews ...Citation -
P12-200-2856NA Pumping Plant F, Klamath Project, Oregon-California. T. E. Morris, diver, entering trashrack deck access hole to install fabricated float stop. B. H. Carter, line tender; February 17, ...
Citation -
1287. [Image] Lost River Diversion Dam - Inspection of spillway stilling basin after 54 years of service
P12-200-2857NA Lost River Diversion Dam, Klamath Project, Ore.-Cal. Original timber covering the basin floor and concrete in overflow structure were in excellent condition. Two to three inches of ice ...Citation -
P12-200-2858NA Lost River Diversion Dam, Klamath Project, Ore.-Cal. The five-man Regional Diving Team "warming up" after completion of stilling basin and downstream apron inspection. Left to right: T. ...
Citation -
P12-200-2859A Klamath Project, Region 2 - Oregon-California. Hole is located on center line of tailrace area at Sta. 5+14. (Note good rock at start of hole); September 24, 1965; Bureau of Reclamation ...
Citation -
P12-200-2860A Klamath Project, Region 2 - Oregon-California. Hole is located on center line of tailrace area at Sta. 6_24_. (This hole was moved upstream because they could not get the drill rig into ...
Citation