Search
You searched for:
Start Over
Irrigation
Remove constraint Irrigation
Subject
Irrigation projects
Remove constraint Subject: Irrigation projects
Subject
Tule Lake Region (California)
Remove constraint Subject: Tule Lake Region (California)
Subject
Tule Lake Sump (California)
Remove constraint Subject: Tule Lake Sump (California)
Material Types
Image
Remove constraint Material Types: Image
« Previous | 1 - 10 of 256 | Next »
Search Results
-
1. [Image] TULE LAKE SUMP 3, N-1 LATERAL
KP-2620-R2-Klamath Project -- TULE LAKE SUMP 3, N-1 LATERAL. View looking north showing completed lateral, 101-C-1 Drain and east-west secondary drains. North-south lines in fields are farmers' irrigation ...Citation -
2. [Image] TULE LAKE SUMP 3, N-8 LATERAL
KP-2621-R2-Klamath Project -- TULE LAKE SUMP 3, N-8 LATERAL. View looking north showing reconstruction of lateral under Specs. DC-5389. East bank of existing lateral is being moved to form west bank of ...Citation -
P12-200-2649 - Klamath Project, California - TULE LAKE SUMP 3, N-13 Lateral Specifications DC-5686. View looking west from N-Canal bank. Bottom lining, south lining and bank are completed. Lining on north ...
Citation -
C12-200-2706 - Klamath Project - TULE LAKE SUMP 3 - Specs. No. DC-5389 - N-1 Lateral. Recently-discovered crack in bottom of N-1 Lateral. View looking upstream near Sta. 102. Lateral was in use during ...
Citation -
P12-200-2653 - Klamath Project, California - TULE LAKE SUMP 3, N-12-e Lateral, Specifications DC-5686. View looking east to 42-inch diameter flume over 101-B Drain. Large amount of return flow from secondary ...
Citation -
P12-200-2701 - Klamath Project, California - TULE LAKE SUMP 3 - Specifications DC-5686 - N-12-a Lateral, Station 78. View looking southeast showing motor patrol finishing lining; September 5, 1962; Photo ...
Citation -
7. [Image] TULE LAKE SUMP 3 - Spec. No. 200C-519
P12-200-2722 - Klamath Project - TULE LAKE SUMP 3 - Spec. No. 200C-519. Farm ditch, Station 92+55 of N-1 Lateral, looking east. Photo taken after first irrigation; May 3, 1963; Photo by D. W. SteinCitation -
8. [Image] Tule Lake Sump 2, Pumping Plant 9
KP-2511-R2-Klamath Project -- Tule Lake Sump 2, Pumping Plant 9. Tule Lake Irrigation District removes old structure at pumping plant site. This structure was floated on oil barrels and end was anchored ...Citation -
KP-2569-R2-Klamath Project - TULE LAKE DIVISION - Sump 2, Specifications DC-5248, Q-2 Lateral. Water truck sprinkling material placed by Hancock Elevating Scraper for lining of Q-2 Lateral, Station 22+00 ...
Citation -
KP-2570-R2-Klamath Project - TULE LAKE DIVISION - Sump 2, Specifications DC-5248, Q-2 Lateral. Hancock Elevating Scraper Model 7E2 and John Deere Tractor, Model 840 placing lining material on Q-2 Lateral ...
Citation