Search

You searched for: Start Over History Remove constraint History Subject Irrigation projects Remove constraint Subject: Irrigation projects Subject Pumping Plant E (Oregon) Remove constraint Subject: Pumping Plant E (Oregon) Material Types Image Remove constraint Material Types: Image

Search Results

  • 1517
    KP-1173-R2 Klamath Project; Pumping Unit No. 3 only installed complete. Refer to picture No. KP-1166-R2; June 6, 1946; Photo by R. S. Hopkins
    Citation
  • 4271
    P-12-200-4189NA Klamath Project - Oregon-California; June 1976; USBR photo by D. W. Stein
    Citation
  • 4272
    P-12-200-4190NA Klamath Project - Oregon-California; June 1976; USBR photo by D. W. Stein
    Citation
  • 2555
    KP-1965-Klamath Project. Pumping Plant "E". Smith Ketchum inspecting; June 7, 1950; Photo by Andrew M. Bergloff
    Citation
  • 3389
    P12-200-2686 - Klamath Project, Oregon - KLAMATH STRAITS DRAIN, flume across Klamath Straits Drain at Pumping Plant E. View of south side of flume looking west, showing material that was eroded into the ...
    Citation
  • 3390
    P12-200-2687 - Klamath Project, Oregon - KLAMATH STRAITS DRAIN flume across Klamath Straits Drain at Pumping Plant E. View of north side of flume looking west, showing material that was eroded into the ...
    Citation
  • 3391
    P12-200-2688 - Klamath Project, Oregon - KLAMATH STRAITS DRAIN, flume across Klamath Straits Drain at Pumping Plant E. Closeup view of north side of flume showing where the material was eroded away from ...
    Citation
  • 1477
    KP-1135-R2 - Klamath Project; Concrete mixing plant of the Tru-Mix Concrete Company at Pumping Plant "E", showing aggregate bins, batching hopper, mixer and the pumpcrets machine used for the delivery ...
    Citation
  • 1507
    KP-1166-R2 - Klamath Project. All construction work at the Plant stopped pending the re-installation of power to contractors' pumps, as a result of the loss of transformers when transformer pole toppled ...
    Citation
  • 1515
    KP-1171-R2 Klamath Project; Construction is complete. Pumping Unit #3 is installed ready for operation. Unit #2 is installed excepting the motor which was damaged during installation: See picture KP-1165-R2 ...
    Citation