P12-201-4541NA Klamath Project, OR-CA. Plant E. Outlet Transition Bridge -- View of Gorman-Rupp jetting pump imported by contractor. Note the undersized intake and exhaust fittings; March 20, 1978; USBR ...
Citation -
P12-201-4542NA Klamath Project, OR-CA. Pumping Plant E Outlet Bridge. Photo shows 3500 Manitowoc on ramp on top of west side bridge piles. This ramp was made so pile driving rig could reach across the ...
Citation -
P12-201-4543NA Klamath Project, OR-CA. Pumping Plant E Outlet Bridge. Same as photo 4542NA above but 3500 Manitowoc now in position to drive piles; March 29, 1978; USBR photo by D.J. Kline
Citation -
P12-201-4552NA Klamath Project, OR-CA. Pumping Plant E. Photo shows Bucyrus Erie 22B and TD-20 cat, both of which have been crossing repeatedly on flume bridge east side; April 7, 1978; USBR photo by ...
Citation -
P12-201-4553NA Klamath Project, OR-CA. Pumping Plant E Bridge. Contractor is moving bridge section laterally at this point; April 1978; USBR photo by D.J. Kline
Citation -
P12-201-4554NA Klamath Project, OR-CA. Pumping Plant E Bridge. Note that hillman rollers pivot for the turn under full load and with load stationary; April 1978; USBR photo by D.J. Kline
Citation -
P12-201-4555NA Klamath Project, OR-CA. Pumping Plant E Bridge. At this point contractor has travelled main traverse and is getting positioned to travel laterally with bridge section; April 1978; USBR ...
Citation -
P12-201-4556NA Klamath Project, OR-CA. Pumping Plant E Bridge. Tow line is hooked up to HD-5 cat to provide momentum to bridge section across main traverse; April 1978; USBR photo by D.J. Kline
Citation -
P12-201-4557NA Klamath Project, OR-CA. Pumping Plant E Bridge. Bridge section is in position over abutments and is jacked down onto bearing pads in stages; April 1978; USBR photo by D.J. Kline
Citation -
P12-201-4558NA Klamath Project, OR-CA. Pumping Plant E Bridge. Completed and ready for travel; May 1978; USBR photo by D.J. Kline
Citation