Search Results
-
P12-201-4479 NA Klamath Project, OR-CA. Contractor had to pre-excavate sites where PP 'E' bridge piling would be driven. During construction of PP 'E', a pit run material was used for backfill. Apparently ...
Citation -
P12-201-4480 NA Klamath Project, OR-CA. Photo shows damaged area of PP 'E' outlet transition west wall. Photo taken prior to pile driving operations. Looking down; November 15, 1977; USBR photo by D.J. ...
Citation -
P12-201-4481 NA Klamath Project, OR-CA. Picture shows area where PP 'E' bridge will be constructed over outlet transition. View taken from west side of KSD, looking east; November 15, 1977; USBR photo ...
Citation -
P12-201-4482 NA Klamath Project, OR-CA. View of inlet transition interior. Note: Walls were partially formed. Contractor covering up to prevent further amounts of snow from getting into formed walls; ...
Citation -
P12-201-4509 NA Klamath Project, OR-CA. Pumping Plant EE -- View of inlet areas of Plants E and EE. Note Plant EE was allowed to flood after removing of dewatering apparatus due to lull in construction ...
Citation -
P12-201-4534 NA Klamath Project, OR-CA. Pumping Plant EE -- Plant E bridge piling at a depth of 39 feet after nearly 2 days' work. Note water jet at this time consisted of 3/4" steel pipe with Gorman Rupp ...
Citation -
P12-201-4536NA Klamath Project, OR-CA. Plant E Bridge -- RHC personnel drilling out sheared slide bolts from Vulcan No. 1 hammer. Repairs took 14 man hours to complete; March 21, 1978; USBR photo by ...
Citation -
P12-201-4537NA Klamath Project, OR-CA. Pumping Plant E -- SW corner of Plant E where water return was coming from pile driving jetting operations while working on west side of additional piling of ...
Citation -
P12-201-4539NA Klamath Project, OR-CA. Plant E Outlet Transition Bridge -- Water jetting from nozzle. Water jet traveled approx. 4 ft. horizontally before hitting the imaginary ground surface (est. 22 ...
Citation -
P12-201-4540NA Klamath Project, OR-CA. Plant E Outlet Transition Bridge -- Water flowing from base of the left retaining wall at Plant E. Flow was a by-product of jetting operations for Plant E west ...
Citation