Search

You searched for: Start Over Irrigation Remove constraint Irrigation Subject Irrigation projects Remove constraint Subject: Irrigation projects Subject Klamath Project (U.S.) -- History Remove constraint Subject: Klamath Project (U.S.) -- History Subject Tule Lake Sump (California) Remove constraint Subject: Tule Lake Sump (California)

Search Results

  • 3581
    KP-2565-R2-Klamath Project - TULE LAKE DIVISION, Sump 2, Specifications DC-5248, Q-Canal. Completed section of Q-Canal, looking upstream from Station 48+00. Bottom width, 10 feet; height of canal banks, ...
    Citation
  • 3582
    KP-2566-R2-Klamath Project - TULE LAKE DIVISION, Sump 2, Q-Canal - Specifications DC-5248. Prefabricated metal farm turnout inlet with well for flow measurement; September 21, 1960; Photo by John A. Re...
    Citation
  • 3583
    KP-2567-R2-Klamath Project - TULE LAKE DIVISION, Sump 2, Specifications DC-5248, Q-Canal. Installing prefabricated metal farm turnout at Station 9+50, Q-Canal metal diaphragm in background; October 18, ...
    Citation
  • 3584
    KP-2568-R2-Klamath Project - TULE LAKE DIVISION - Sump 2, Specifications DC-5248, Q-1 Lateral. Installing prefabricated metal wasteway at the end of the Q-1 Lateral, Station 88+33.7. Backfill compacted ...
    Citation
  • 3639
    KP-2573-R2-Klamath Project - TULE LAKE DIVISION - Sump 2, Specifications DC-5307, R-Canal. 4-inch diameter aluminum pipe sprinkler system being used to sprinkle borrow areas adjacent to R-Canal, Station ...
    Citation
  • 3640
    KP-2574-R2-Klamath Project - TULE LAKE DIVISION - Sump 2, Specifications DC-5307, R-Canal. Gasoline engine-driven pump supplies water for sprinkler system; September 30, 1960; Photo by John A. Renning
    Citation
  • 3644
    KP-2578-R2-Klamath Project - TULE LAKE DIVISION, SUMP 3, Specifications DC-5389, Secondary Drain No. 4. View of Hancock elevating scrapers excavating select material from Secondary Drain No. 4 for use ...
    Citation
  • 3645
    KP-2579-R2-Klamath Project - TULE LAKE DIVISION, SUMP 3, Specifications DC-5389, N-1 Lateral. Hancock elevating scraper placing select lining material at Station 84+00; January 26, 1961; Photo by Sam C. ...
    Citation
  • 3646
    KP-2580-R2-Klamath Project - TULE LAKE DIVISION, SUMP 3, Specifications DC-5389, N-1 Lateral. 48" LaTourneau roller compacting selected earth lining near Station 82+00; January 26, 1961; Photo by Sam ...
    Citation
  • 3647
    KP-2581-R2-Klamath Project - TULE LAKE DIVISION, SUMP 2, Specifications DC-5248, Q-Canal. Q-Canal headworks showing gate lifts installed and inlet channel completed; January 17, 1961; Photo by John A. ...
    Citation