Search
You searched for:
Start Over
Irrigation
Remove constraint Irrigation
Subject
Irrigation projects
Remove constraint Subject: Irrigation projects
Subject
Klamath Project (U.S.) -- History
Remove constraint Subject: Klamath Project (U.S.) -- History
Subject
Pumping stations -- Design and construction
Remove constraint Subject: Pumping stations -- Design and construction
Material Types
Image
Remove constraint Material Types: Image
« Previous | 1 - 10 of 254 | Next »
Search Results
-
KP-2497-R2 - Klamath Project - PUMPING PLANT "U", Tulelake Irrigation District. Completed Pumping Plant with one 10 c.f.s. vertical pumping unit; March 11, 1959; Photo by L. McAnulty
Citation -
KP-2498-R2- Klamath Project - PUMPING PLANT "V", Tulelake Irrigation District. Completed Pumping Plant with two 10 c.f.s. vertical pumping units; March 11, 1959; Photo by L. McAnulty
Citation -
KP-2499-R2- Klamath Project - PUMPING PLANT "V", Tulelake Irrigation District. View looking across 100-D-1 drain to pumping plant constructed under Specifications 200C-393. Outlet box is near automobile; ...
Citation -
4. [Image] Tule Lake Sump 2, Pumping Plant 9
KP-2511-R2-Klamath Project -- Tule Lake Sump 2, Pumping Plant 9. Tule Lake Irrigation District removes old structure at pumping plant site. This structure was floated on oil barrels and end was anchored ...Citation -
KP-2593-R2-Klamath Project - TULE LAKE DIVISION, SUMP 2, Specifications DC-5358, Pumping Plant "W". View looking southwest into inlet channel of Pumping Plant "W". Plant is irrigating the southwest corner ...
Citation -
6. [Image] General View of Location of new Pumping Plant "EE" and Center Flume extention, looking north
P-12-200-4187NA Klamath Project - Oregon-California; June 1976; USBR photo by D. W. SteinCitation -
P12-201-4294 NA Klamath Project OR-CA. Pumping Plant EE piling for Bent No. 1 background, and Bent No. 2 in place. Required extra piling foreground, left, as piling next to it didn't meet specs. design. ...
Citation -
P-12-201-4295 NA Klamath Project, OR-CA. Excavation of Pumping Plant EE site, using dragline. A 3500 Manitowoc crane with 1-yard bucket, was in use. Material encountered was same as indicated in Drawing ...
Citation -
P-12-201-4303 NA Klamath Project, OR-CA. Soldier piling (1'x1') driven to contractor's plan to a depth of ±9', to be used in conjunction with wood lagging to protect worker and work inside Plant EE work ...
Citation -
P12-201-4304 NA Klamath Project, OR-CA. Snall (sic) leak developing on west bank about midway and ±6' down from excavation surface at Plant E; December 1976; USBR photo by D. J. Kline
Citation