Search
You searched for:
Start Over
Irrigation
Remove constraint Irrigation
Subject
Irrigation projects
Remove constraint Subject: Irrigation projects
Subject
Klamath Project (U.S.) -- History
Remove constraint Subject: Klamath Project (U.S.) -- History
Subject
Klamath Straits Drain (Oregon)
Remove constraint Subject: Klamath Straits Drain (Oregon)
Subject
Piling (Civil engineering)
Remove constraint Subject: Piling (Civil engineering)
Subject
Pumping stations -- Design and construction
Remove constraint Subject: Pumping stations -- Design and construction
« Previous | 1 - 10 of 18 | Next »
Search Results
-
P12-201-4479 NA Klamath Project, OR-CA. Contractor had to pre-excavate sites where PP 'E' bridge piling would be driven. During construction of PP 'E', a pit run material was used for backfill. Apparently ...
Citation -
P12-201-4542NA Klamath Project, OR-CA. Pumping Plant E Outlet Bridge. Photo shows 3500 Manitowoc on ramp on top of west side bridge piles. This ramp was made so pile driving rig could reach across the ...
Citation -
P12-201-4543NA Klamath Project, OR-CA. Pumping Plant E Outlet Bridge. Same as photo 4542NA above but 3500 Manitowoc now in position to drive piles; March 29, 1978; USBR photo by D.J. Kline
Citation -
P12-201-4572NA Klamath Project, OR-CA. Plant E. Outlet east side bridge footing forms. Note back of footing was extended to allow for out of specifications piling. The extra concrete and steel was at ...
Citation -
P12-201-4316 NA Klamath Project, OR-CA. Completed bents No. 1 and 2 of construction bridge with P+H 670 in position to drive piling in Plant EE; January 18, 1977; USBR photo by D. J. Kline
Citation -
P12-201-4318 NA Klamath Project, OR-CA. Vulcan No. 1 hammer to be used in Pumping Plant EE pile driving; January 18, 1977; USBR photo by D. J. Kline
Citation -
P12-201-4319 NA Klamath Project, OR-CA. Shown is Row 12 vertical piling driven before cutoff at Pumping Plant EE site; January 20, 1977; USBR photo by D. J. Kline
Citation -
P12-201-4320 NA Klamath Project, OR-CA. Row 12, Line 1, piling split at a depth of approximately 47 feet, Plant EE; January 20, 1977; USBR photo by D. J. Kline
Citation -
P12-201-4321 NA Klamath Project, OR-CA. Pumping Plant EE - Setting batter piling butt into hammer lead; January 24, 1977; USBR photo by D. J. Kline
Citation -
P12-201-4328 NA Klamath Project, OR-CA. View of pumping plant EE looking n. e. at piling with rows 6 thru 12 completed. Not shown are the 3 extra piling requred by the Regional office; February 17, ...
Citation