241. [Image] Looking south at approach that was placed by TID
CN-12-201-302NA Klamath Project - Oregon-California. (See caption on CN-12-201-301); December 1972; Bureau of Reclamation photo by D. W. SteinCitation -
242. [Image] View of TID's dragline excavating in the “N" Canal prior to the placement of a large CMP
CN-12-201-300NA Klamath Project - Oregon-California. (See caption on CN-12-201-299); December 1972; Bureau of Reclamation photo by D. W. SteinCitation -
863 Klamath; June 13, 1939; "CCC" stands for "Civilian Concervation Corps"
Citation -
864 Klamath; June 13, 1939; "CCC" stands for "Civilian Conservation Corps"
Citation -
245. [Image] Flood Damage Repair in Langell Valley
P12-200-2835NA Flood Damage Repair in Langell Valley - Klamath Project - Oregon - California. Linkbelt (LS-85) dragline excavating pilot trench in bottom section, to divert water to right side of Miller ...Citation -
246. [Image] P12-201-4601NA. Same as #4600 above
P12-201-4601NA Same as #4600 above P12-201-4602NA Same as #4600 aboveCitation -
247. [Image] P12-201-4602NA
P12-201-4602NACitation -
P-12-200-4153NA Klamath Project - Oregon-California. Placing 8, 6, and 4-inch perforated plastic pipe with drain guard approximately 6 ft. deep, 3 ft. inside our right of way between Sta. 210 and 267, ...
Citation -
P-12-200-4154NA Klamath Project - Oregon-California. Placing 8, 6, and 4-inch perforated plastic pipe with drain guard approximately 6 ft. deep, 3 ft. inside our right of way between Sta. 210 and 267, ...
Citation -
P-12-200-4155NA Klamath Project - Oregon-California. Placing 8, 6, and 4-inch perforated plastic pipe with drain guard approximately 6 ft. deep, 3 ft. inside our right of way between Sta. 210 and 267, ...
Citation