    P-12-201-4295 NA Klamath Project, OR-CA. Excavation of Pumping Plant EE site, using dragline. A 3500 Manitowoc crane with 1-yard bucket, was in use. Material encountered was same as indicated in Drawing ...
    Citation
  • 4377
    P-12-201-4296 NA Klamath Project, OR-CA. Outlet of Pumping Plant E. Crack in top of side wall on east side; December 1976; USBR photo by D. J. Kline
    Citation
  • 4382
    P-12-201-4301 NA Klamath Project, OR-CA. Stripped and cured wing wall flume support for Center Canal outlet transition; December 1976; USBR photo by D. J. Kline
    Citation
  • 4384
    P-12-201-4303 NA Klamath Project, OR-CA. Soldier piling (1'x1') driven to contractor's plan to a depth of ±9', to be used in conjunction with wood lagging to protect worker and work inside Plant EE work ...
    Citation
  • 4385
    P12-201-4304 NA Klamath Project, OR-CA. Snall (sic) leak developing on west bank about midway and ±6' down from excavation surface at Plant E; December 1976; USBR photo by D. J. Kline
    Citation
  • 4386
    P12-201-4305 NA Klamath Project, OR-CA. Dike built up another ±5' on inlet to Center Canal Flume; December 1976; USBR photo by D. J. Kline
    Citation
  • 4389
    P12-201-4308 NA Klamath Project, OR-CA. Gravity hammer 2500 lbs. placing pile to depth of 2-3 feet for further driving to desired depth by air hammer. Soldier pile 1'x1'x16'; December 1976; USBR photo ...
    Citation
  • 4390
    P12-201-4309 NA Klamath Project, OR-CA. Break in earth dike holding farm land flood water. Dike located on west side of KSD. Approx. 8 man hours and 2 hrs. of Case 580 time was used; January 17, 1977; ...
    Citation
  • 4404
    P12-201-4322 NA Klamath Project, OR-CA. Center Canal - Case 580 Construction King used to break 18" frost layer for flume extension floor; January 25, 1977; USBR photo by D. J. Kline
    Citation
  • 4405
    P12-201-4323 NA Klamath Project, OR-CA. Center Canal - Floor form for pier extension over flume pier excavation; January 25, 1977; USBR photo by D. J. Kline
    Citation