You searched for: Start Over History Remove constraint History Subject Irrigation canals and flumes -- Maintenance and repair Remove constraint Subject: Irrigation canals and flumes -- Maintenance and repair Subject Klamath Project (U.S.) -- History Remove constraint Subject: Klamath Project (U.S.) -- History Subject Klamath Straits Drain (Oregon) Remove constraint Subject: Klamath Straits Drain (Oregon) Database Klamath Waters Library Remove constraint Database: Klamath Waters Library

Search Results

  • 4367
    P12-201-4286 NA Klamath Project OR-CA. Overall view of leads with Vulcan 1 hammer and water jet pipe and 4" hose leading to it. In background is a dewatering pump. Center Canal flume; January 7, 1977; ...
    Citation
  • 4368
    P12-201-4287 NA Klamath Project OR-CA. Closer view of water jetting preparation. Note two pile bucks setting water jet; January 7, 1977; USBR photo by D.J. Kline
    Citation
  • 4369
    P12-201-4288 NA Klamath Project OR-CA. Results of 1/7 water jetting. Note two piling (upper right and center right). These were the two piling jetted to 35' depth; January 10, 1977; USBR photo by D. ...
    Citation
  • 4370
    P12-201-4289 NA Klamath Project OR-CA. Tying rebar in place for flume pier base (footing); January 13, 1977; USBR photo by D. J. Kline
    Citation
  • 4371
    P12-201-4290 NA Klamath Project OR-CA. 3/4-yard bucket used with Manitowoc 3500 dragline to lift concrete from transit mixer to pier (excavation site). Center Canal flume in background; January 14, 1977; ...
    Citation
  • 4372
    P12-201-4291 NA Klamath Project OR-CA. Finishing of pier slab; pier extension rebar also shown. Center Canal Flume; January 14, 1977; USBR photo by D. J. Kline
    Citation
  • 4373
    P12-201-4292 NA Klamath Project OR-CA. Curing protection for below freezing conditions. Bisqueen tent and in background, note 10 gal. propane tank with radiant heater placed inside tent. Pier footing ...
    Citation
  • 4374
    P12-201-4293 NA Klamath Project OR-CA. View of pier outlet transition with 2"x4" every foot in foreground. Note pressed wood 4' x 8' sheets, with compacted backfill. Forms will be removed after placement. ...
    Citation
  • 4375
    P12-201-4294 NA Klamath Project OR-CA. Pumping Plant EE piling for Bent No. 1 background, and Bent No. 2 in place. Required extra piling foreground, left, as piling next to it didn't meet specs. design. ...
    Citation
  • 4376
    P-12-201-4295 NA Klamath Project, OR-CA. Excavation of Pumping Plant EE site, using dragline. A 3500 Manitowoc crane with 1-yard bucket, was in use. Material encountered was same as indicated in Drawing ...
    Citation