Search
You searched for:
Start Over
History
Remove constraint History
Subject
Irrigation canals and flumes -- Maintenance and repair
Remove constraint Subject: Irrigation canals and flumes -- Maintenance and repair
Subject
Klamath Project (U.S.) -- History
Remove constraint Subject: Klamath Project (U.S.) -- History
Subject
Klamath Straits Drain (Oregon)
Remove constraint Subject: Klamath Straits Drain (Oregon)
Material Types
Image
Remove constraint Material Types: Image
« Previous | 111 - 116 of 116 | Next »
Search Results
-
P12-201-4451 NA Klamath Project, OR-CA. View of tunnel outlet under railroad track with double wall cribbing and added cribbing support; August 19, 1977; USBR photo by D.J. Kline
Citation -
P12-201-4452 NA Klamath Project, OR-CA. Completing shoring for tunnel exit under SP rr tracks. Shoring used 1.7' to 0.9' Douglas fir timber piling cut at required lengths; August 23, 1977; USBR photo ...
Citation -
P-12-200-4153NA Klamath Project - Oregon-California. Placing 8, 6, and 4-inch perforated plastic pipe with drain guard approximately 6 ft. deep, 3 ft. inside our right of way between Sta. 210 and 267, ...
Citation -
P-12-200-4154NA Klamath Project - Oregon-California. Placing 8, 6, and 4-inch perforated plastic pipe with drain guard approximately 6 ft. deep, 3 ft. inside our right of way between Sta. 210 and 267, ...
Citation -
P-12-200-4155NA Klamath Project - Oregon-California. Placing 8, 6, and 4-inch perforated plastic pipe with drain guard approximately 6 ft. deep, 3 ft. inside our right of way between Sta. 210 and 267, ...
Citation -
P-12-200-4156NA Klamath Project - Oregon-California. Placing 8, 6, and 4-inch perforated plastic pipe with drain guard approximately 6 ft. deep, 3 ft. inside our right of way between Sta. 210 and 267, ...
Citation