Search

You searched for: Start Over History Remove constraint History Subject Irrigation canals and flumes -- Maintenance and repair Remove constraint Subject: Irrigation canals and flumes -- Maintenance and repair Subject Klamath Project (U.S.) -- History Remove constraint Subject: Klamath Project (U.S.) -- History Subject Klamath Straits Drain (Oregon) Remove constraint Subject: Klamath Straits Drain (Oregon) Material Types Image Remove constraint Material Types: Image

Search Results

  • 4533
    P12-201-4451 NA Klamath Project, OR-CA. View of tunnel outlet under railroad track with double wall cribbing and added cribbing support; August 19, 1977; USBR photo by D.J. Kline
    Citation
  • 4534
    P12-201-4452 NA Klamath Project, OR-CA. Completing shoring for tunnel exit under SP rr tracks. Shoring used 1.7' to 0.9' Douglas fir timber piling cut at required lengths; August 23, 1977; USBR photo ...
    Citation
  • 4235
    P-12-200-4153NA Klamath Project - Oregon-California. Placing 8, 6, and 4-inch perforated plastic pipe with drain guard approximately 6 ft. deep, 3 ft. inside our right of way between Sta. 210 and 267, ...
    Citation
  • 4236
    P-12-200-4154NA Klamath Project - Oregon-California. Placing 8, 6, and 4-inch perforated plastic pipe with drain guard approximately 6 ft. deep, 3 ft. inside our right of way between Sta. 210 and 267, ...
    Citation
  • 4237
    P-12-200-4155NA Klamath Project - Oregon-California. Placing 8, 6, and 4-inch perforated plastic pipe with drain guard approximately 6 ft. deep, 3 ft. inside our right of way between Sta. 210 and 267, ...
    Citation
  • 4238
    P-12-200-4156NA Klamath Project - Oregon-California. Placing 8, 6, and 4-inch perforated plastic pipe with drain guard approximately 6 ft. deep, 3 ft. inside our right of way between Sta. 210 and 267, ...
    Citation