Search

You searched for: Start Over Land use history Remove constraint Land use history Subject Irrigation canals and flumes -- Linings Remove constraint Subject: Irrigation canals and flumes -- Linings

Search Results

  • 1884
    KP-1531-Klamath Project. Tests show 100% compaction for this section - 6" slide rule used for comparison; August 29, 1947; Photo by Dorwin Grise
    Citation
  • 2989
    KP-2190-R2--Lower Cost Canal Lining. Klamath Project. M-2-a Lateral. Flat-iron roller which has five 18" X 16" airplane tires. Used in compacting earth lining; April 13, 1953; Bureau of Reclamation Photo ...
    Citation
  • 3058
    KP-2207-R2 - Lower Cost Canal Lining - A-3 Lateral. Klamath Project. Using up the short pieces; April 15, 1953; Bureau of Reclamation Photo by Mark D. Taylor, Jr.
    Citation
  • 1853
    KP-1507-R2 - Klamath Project; Using 2" X 4" strike-off, the improvement in the surface, caused by the second pass of the 4" X 6" strike-off, is readily noted above the 2" X 4" strike-off; July 18, 1947; ...
    Citation
  • 1854
    KP-1508-R2 - Klamath Project; Using wood bull float after striking off with 2 x 4; Time approximately 1:40 P. M., July 18, 1947; Stacy, contractor; Photo by H. W. Sexton
    Citation
  • 1855
    KP-1509-R2 - Klamath Project; Using Fresno float (steel) after bull float; Time approximately 1:44 P. M., July 18, 1947; Stacy, contractor; Photo by H. W. Sexton
    Citation
  • 3644
    KP-2578-R2-Klamath Project - TULE LAKE DIVISION, SUMP 3, Specifications DC-5389, Secondary Drain No. 4. View of Hancock elevating scrapers excavating select material from Secondary Drain No. 4 for use ...
    Citation
  • 3735
    KP-2637-R2-Klamath Project - TULE LAKE SUMP 2, R-2 Lateral, Specifications DC-5483. Front view of Briscoe ditcher excavating prism of R-2 lateral, Sta. 2+00 after lining has been placed solid across the ...
    Citation
  • 2398
    KP-1895 - Klamath Project. Lower Cost Canal Lining. Picture shows asphalt sheets as will be left for backfill. Overlapping edges are not welded whatsoever. Edges are poured with asphalt compound, RC-0 ...
    Citation
  • 2446
    KP-1929 - Klamath Project. Lower Cost Canal Lining. Wasteway of the N-16 Lateral showing method of laying asphalt. Pipe through center of roll is used to carry roll up side of bank; March 29, 1950; Photo ...
    Citation