Search
You searched for:
Start Over
Photos
Remove constraint Photos
Subject
Irrigation canals and flumes -- Linings
Remove constraint Subject: Irrigation canals and flumes -- Linings
« Previous | 131 - 140 of 171 | Next »
Search Results
-
KP-1989 - Klamath Project. Lower cost canal lining. Close-up of process of flowing RC-0 compound on asphalt. A 3' x 2" pipe with one end smashed into a spatula shape is welded on to a flower watering ...
Citation -
132. [Image] Lower Cost Canal Lining - N-16 Lateral
KP-1904 - Klamath Project. Lower Cost Canal Lining. N-16 Lateral. Between Sta. 84-30 & 84-60, a transition takes place where the regular 10-ft. bottom becomes a 6-ft. bottom. Picture shows also the ...Citation -
133. [Image] Lower Cost Canal Lining - N-16 Lateral
KP-1905 - Klamath Project. Lower Cost Canal Lining. N-16 Lateral. Pictures are taken showing the process of applying RC-0 with two buckets in motion. Crew of 7 men. Asphalt rolls stand ready on bank ...Citation -
134. [Image] Lower Cost Canal Lining - N-16 Lateral
KP-1908 - Klamath Project. Lower Cost Canal Lining. N-16 Lateral. Picture taken form north side of channel showing damage done to recently laid asphalt. Damage was done overnight by strong wind. Dust ...Citation -
135. [Image] Lower Cost Canal Lining - Picture taken at 100-Drain
KP-1929 - Klamath Project. Lower Cost Canal Lining. Wasteway of the N-16 Lateral showing method of laying asphalt. Pipe through center of roll is used to carry roll up side of bank; March 29, 1950; Photo ...Citation -
136. [Image] Lower Cost Canal Lining, Klamath Project
KP-2194-R2--Lower Cost Canal Lining, Klamath Project. M-2-a Lateral. Compacted earth lining. Looking upstream from Sta. 137+50. 18-ft. Bottom; two 6-inch layers in place; March 29, 1953; Bureau of Reclamation ...Citation -
137. [Image] KP-2196-R2--Lower Cost Canal Lining
KP-2196-R2--Lower Cost Canal Lining. Klamath Project. M-2-a-1 Lateral. Bottom of ditch, after standing from fall until spring, opened up for compacted earth lining. Discing to mix top, dry material with ...Citation -
138. [Image] Lower Cost Canal Lining
KP-2198-R2--Lower Cost Canal Lining. Klamath Project. M-2-a Lateral. P&H 255, 3/4-Yd. Dragline shaping up bank of lateral. Compacted earth lining in immediate foreground. Other bank has been completed ...Citation -
139. [Image] Lower Cost Canal Lining
KP-2191-R2--Lower Cost Canal Lining. Klamath Project. Sta. 150+00. M-2-a Lateral. D-8 Cat with dozer moving bank material from outer storage pile into compacted bank section; April 13, 1953; Bureau of ...Citation -
140. [Image] South Branch Canal, lined section
March 11, 1909Citation