Search
You searched for:
Start Over
Photos
Remove constraint Photos
Subject
Irrigation canals and flumes -- Linings
Remove constraint Subject: Irrigation canals and flumes -- Linings
« Previous | 91 - 100 of 171 | Next »
Search Results
-
P-12-200-2695 - Klamath Project, California - TULE LAKE SUMP 3 - Specifications DC-5686 - N-15-b Lateral, Station 34. View looking south showing motor patrol finishing lining on south bank; August 6, ...
Citation -
P12-200-2701 - Klamath Project, California - TULE LAKE SUMP 3 - Specifications DC-5686 - N-12-a Lateral, Station 78. View looking southeast showing motor patrol finishing lining; September 5, 1962; Photo ...
Citation -
P12-200-2710 - Klamath Project - TULE LAKE SUMP 3 - Contract Unit 1 - Specs. DC-5389 - N-1 Lateral. View of water standing on lining directly over crack four days after storm of February 1-3, 1963. Note ...
Citation -
94. [Image] Low Cost Canal Lining - J-3 Lateral
KP-1689 - Klamath Project. Low Cost Canal Lining. Spreading "Volclay" bentonite on bank to eliminate seepage. Dragline placing earthcover over bentonite layer in ditch. Soil cover is to prevent mechanical ...Citation -
95. [Image] Low Cost Canal Lining - J-3 Lateral.
KP-1690- Klamath Project. Low Cost Canal Lining. Spreading "Volclay" bentonite on bank to eliminate seepage. Bentonite is spread along upper edge of bank and raked down the slope and into the top layer ...Citation -
96. [Image] Low Cost Canal Lining - J-3 Lateral
KP-1691 - Klamath Project. Low Cost Canal Lining. Spreading "Volclay" bentonite on bank to eliminate seepage. Dragline placing earthcover over bentonite layer in ditch. Soil cover is to prevent mechanical ...Citation -
KP-2354-R2 - Klamath Project--BUTTE VALLEY IRRIGATION DISTRICT. Concrete-lined ditch; 8 yrs. old; 2 in. thick concrete. Butte Valley aggregate in good condition. NE Corner Sec. 25, R. 2 W., T. 46 N.; August ...
Citation -
98. [Image] TULE LAKE SUMP 3, Specs. DC-5621
P12-200-2662 - Klamath Project, California - TULE LAKE SUMP 3, Specs. DC-5621. N-12-b Lateral, Sta. 54. 1 1/2 cu yard Link Belt Dragline building normal bank on top of lining. Material will be smoothed ...Citation -
KP-2554-R2-Klamath Project - TULE LAKE DIVISION - Sump 2, Specifications DC-5248 - Q-Canal. TD-18 Tractor and 4'x4' dual drum sheepsfoot roller compacting canal lining, bottom of Q-Canal, Station 38+00; ...
Citation -
KP-2555-R2-Klamath Project - TULE LAKE DIVISION - Sump 2, Specifications DC-5248, Q-1 Lateral. 10 cubic yard scraper and TD-14 tractor placing lining in left bank lateral, Station 1+00; July 29, 1960; ...
Citation