Irrigation canals and flumes -- Design and construction
Remove constraint Subject: Irrigation canals and flumes -- Design and construction
« Previous | 171 - 180 of 266 | Next »
Search Results
-
P12-201-4559NA Klamath Project, OR-CA. Center Canal Flume Bridge. Note 3' long x 1' wide x 1/4 " steel (Schedule 20) sleeves to be used by RHC to splice piles that did not reach minimum penetration; ...
Citation -
P12-201-4560NA Klamath Project, OR-CA. Center Canal Flume Bridge. Two holes precut into steel sleeve on one side only, prior to pile fitting; April 4, 1978; USBR photo by D.J. Kline
Citation -
P12-201-4561NA Klamath Project, OR-CA. Center Canal Flume Bridge. Flume Bridge south abutment. Original driven pile trimmed and ready to receive steel splice sleeve; April 4, 1978; USBR photo by D.J. ...
Citation -
P12-201-4562NA Klamath Project, OR-CA. Center Canal Flume Bridge. The steel sleeve was placed on the pile and the holes in the sleeve were marked on the pile. The sleeve was then removed and a ship's ...
Citation -
P12-201-4563NA Klamath Project, OR-CA. Center Canal Flume Bridge. Torquing the 14" x 3/4" steel bolts connecting the steel sleeve to bottom piling; April 4, 1978; USBR photo by D.J. Kline
Citation -
P12-201-4564NA Klamath Project, OR-CA. Center Canal Flume Bridge. The top or splice piling is inserted into the sleeve and then the ship's auger was used to bore out the hole for the 3/4 " bolt; April ...
Citation -
P12-201-4565NA Klamath Project, OR-CA. Center Canal Flume Bridge. After the 3/4" hole was augered, a steel pin was used to punch a mark on the opposite side of the steel sleeve. Then an oxy-acetylene ...
Citation -
P12-201-4566NA Klamath Project, OR-CA. Ady Canal -- Siphon hydrostatic test -- Plant FF. Siphon inlet transition was flooded as shown to fill 84" RCP prior to testing 84" CMP; April 6, 1978; USBR photo ...
Citation -
P12-201-4567NA Klamath Project, OR-CA. Ady Canal -- Siphon hydrostatic test -- Plant FF. Siphon outlet transition wa also flooded prior to CMP test as shown; April 6, 1978; USBR photo by D.J. Kline
Citation -
P12-201-4568NA Klamath Project, OR-CA. Ady Canal -- Siphon hydrostatic test -- Plant FF. Water in CMP was held at head of 10" using 192 GMP Homelite pump regulated by means of valve on downstream side ...
Citation