P12-201-4513 NA Klamath Project, OR-CA. Ady Canal -- View of west bank of SP RR after outler (sic) layer of cribbing and reinforcement were removed. It was deemed unsafe to remove anymore of this cribbing. ...
Citation -
P12-201-4515 NA Klamath Project, OR-CA. Ady Canal -- View of outlet transition slab prior to placement. Note heater and tank which will be used to keep temperature above 50° F; February 20, 1978; USBR ...
Citation -
P12-201-4520 NA Klamath Project, OR-CA. Ady Siphon -- View of south wall of siphon inlet transition and portion of backfill over 84-inch RCP; February 28, 1978; USBR photo by D.J. Kline
Citation -
P12-201-4531 NA Klamath Project, OR-CA. View shows open gates on Ady Canal after they had been closed to make 84" RCP crossing under Straits Drain; February 1978; USBR photo by D.J. Kline
Citation -
P12-201-4532 NA Klamath Project, OR-CA. View of 8" pipe being removed due to bolts breaking at connection to 84" RCP (seen at the bottom). This had been completely backfilled and Constr. Inspector (D.W. ...
Citation -
P12-201-4546NA Klamath Project, OR-CA. Center Canal Flume Bridge. For safety of flume, water jet return trench was excavated from east side of pile trench to KSD. No jetting return was evident in flume ...
Citation -
P12-201-4547NA Klamath Project, OR-CA. Center Canal Flume Bridge. Jet trench excavated on north side of flume, same design as south side return trench. This trench did not work, however, as jetting ...
Citation -
P12-201-4549NA Klamath Project, OR-CA. Center Canal Flume Bridge. Wet area shows where unwanted jetting return was exiting into the west side of the drain on NE side of the flume; April 5, 1978; USBR ...
Citation -
P12-201-4550NA Klamath Project, OR-CA. Center Canal Flume Bridge. Lowered water level in flume. Refilled first jet return trench and dug a second deeper trench on an angle toward Pumping Plant E. These ...
Citation -
P12-201-4551NA Klamath Project, OR-CA. Center Canal Flume Bridge. Second return trench was cut into portions of the pile trench and worked well along with other measures to contain jet return; April ...
Citation