Search
You searched for:
Start Over
Photos
Remove constraint Photos
Subject
Irrigation canals and flumes -- Design and construction
Remove constraint Subject: Irrigation canals and flumes -- Design and construction
« Previous | 91 - 100 of 266 | Next »
Search Results
-
P12-200-2703 - Klamath Project - TULE LAKE SUMP 3 - Specs. No. DC-5686 - N-12-a Lateral. View of new lateral looking upstream (north) from Sta. 104+50; January 8, 1963; Photo by C. D. Lawrence
Citation -
P12-200-2704 - Klamath Project - TULE LAKE SUMP 3 - Specs. No. DC-5686 - N-15-a Lateral. View of N-15-a Lateral in final stage of construction. Looking upstream (east) near check at Sta. 40; January 8, ...
Citation -
P12-200-2705 - Klamath Project - TULE LAKE SUMP 3 - Specs. No. DC-5686 - N-15-b Lateral. Final stage of construction looking downstream (west) near Sta. 38; January 8, 1963; Photo by C. D. Lawrence
Citation -
P12-200-2712 - Klamath Project - TULE LAKE SUMP 2 - Specs. No. 200C-519 - Q-2 Lateral, Station 55. View looking east showing fill machine placed. Gradall machine in background trimming side slopes and ...
Citation -
P12-200-2713 - Klamath Project - TULE LAKE SUMP 2 - Specifications. No. 200C-519 - Q-2 Lateral. View looking east showing lateral being filled for first time after raising banks; March 28, 1963; Photo ...
Citation -
96. [Image] M-2-a lateral construction
KP-1238-R2 - Klamath District - Modoc Unit - Coppeck Bay Area. The core trench under the left bank is excavated large to furnish sufficient material for building of the right lateral bank after it has ...Citation -
P12-200-2791A Klamath River - Klamath Project--Oregon. Employees of M-K Co., under contract with PP&L Co., drilling rock and placing explosive for excavation of 100' X 12' X 3500' channel through Keno ...
Citation -
98. [Image] Klamath River - Employees of M-K Co. placing explosive in middle reach of by-pass channel
P12-200-2792A Klamath River - Klamath Project--Oregon. Channel is to be 12 feet deep, about two thirds in rock. River channel is at right of picture. Note dewatering pump in far background; March 3, ...Citation -
P12-200-2793A Klamath River - Klamath Project--Oregon. View from existing Keno regulating dam showing M-K Co. dragline removing blasted rock from by-pass channel. Equipment at right is on old spoil pile, ...
Citation -
P12-200-2797A Klamath River - Klamath Project--Oregon. View west shows lower two-thirds of by-pass channel, about 1000 feet now down to grade. Drills and draglines in distant background are excavating ...
Citation