P12-201-4455 NA Klamath Project, OR-CA. Ady Canal--View of siphon pipe laying operation looking from hwy. west toward RR. Pettibone 30 Multicrane used for lifting; September 1977; USBR photo by D.J. ...
Citation -
P12-201-4456 NA Klamath Project, OR-CA. Ady Canal--Same as photo 4455NA, but view looking from RR east toward highway; September 1977; USBR photo by D.J. Kline
Citation -
P12-201-4463 NA Klamath Project, OR-CA. Center Canal Flume--view looking east. Placement of rip rap on east bank of drain under flume; October 1977; USBR photo by D.J. Kline
Citation -
P12-201-4464 NA Klamath Project, OR-CA. Center Canal Flume--Old timber piling used for flume support in original construction. 12' long max. Note: Tip of piling was pre-sharpened; October 1977; USBR ...
Citation -
P12-201-4465 NA Klamath Project, OR-CA. Ady Canal, U.S. Hwy 97 & SP RR siphon--view looking west upstream end of 84" CAP at Hwy 97. View shows bulkhead that was constructed by contractor for use in ...
Citation -
P12-201-4467 NA Klamath Project, OR-CA. Ady Canal--west end of excavation for siphon inlet transition. Depth is approx. 2.0 ft below subgrade. Note: Free water being pumped out by small 3/" electric ...
Citation -
P12-201-4468 NA Klamath Project, OR-CA. Ady Canal--view looking SE at siphon inlet transition. View shows RE-Steel for slab area is about all in place and tied; October 1977; USBR photo by D.W. Stein ...
Citation -
P12-201-4469 NA Klamath Project, OR-CA. Ady Canal--view looking east at siphon inlet transition slab area. Concrete has just been placed for slab area and is in process of being covered, for cold weather ...
Citation -
P12-201-4471 NA Klamath Project, OR-CA. Ady Canal -- Concrete is being placed in slab of inlet into syphon. Concrete is wet batched from CPI plant from Klamath Falls, OR. It is hauled out to job site in ...
Citation -
P12-201-4389 NA Klamath Project, OR-CA. Center Canal Flume--View showing original flume pier excavation. Notice area of light coloring behind perforated culvert. This is sand washed out from pile driving ...
Citation