Search
You searched for:
Start Over
History
Remove constraint History
Subject
Irrigation canals and flumes -- Design and construction
Remove constraint Subject: Irrigation canals and flumes -- Design and construction
Subject
Irrigation projects
Remove constraint Subject: Irrigation projects
Material Types
Image
Remove constraint Material Types: Image
Database
Klamath Waters Library
Remove constraint Database: Klamath Waters Library
« Previous | 81 - 90 of 241 | Next »
Search Results
-
P12-200-2704 - Klamath Project - TULE LAKE SUMP 3 - Specs. No. DC-5686 - N-15-a Lateral. View of N-15-a Lateral in final stage of construction. Looking upstream (east) near check at Sta. 40; January 8, ...
Citation -
P12-200-2705 - Klamath Project - TULE LAKE SUMP 3 - Specs. No. DC-5686 - N-15-b Lateral. Final stage of construction looking downstream (west) near Sta. 38; January 8, 1963; Photo by C. D. Lawrence
Citation -
P12-200-2712 - Klamath Project - TULE LAKE SUMP 2 - Specs. No. 200C-519 - Q-2 Lateral, Station 55. View looking east showing fill machine placed. Gradall machine in background trimming side slopes and ...
Citation -
P12-200-2713 - Klamath Project - TULE LAKE SUMP 2 - Specifications. No. 200C-519 - Q-2 Lateral. View looking east showing lateral being filled for first time after raising banks; March 28, 1963; Photo ...
Citation -
85. [Image] "M" Canal Lining, Station 131, looking Northeast, placing concrete lining with completed panels on each side
KP-1505-R2 - Klamath Project; First pass with a 4" X 6" strike-off, pulled by winch; Time 1:25 P. M., July 18, 1947; Stacy, contractor; Photo by H. W. SextonCitation -
86. [Image] "M" Canal Lining, Station 131, looking Northeast, placing concrete lining with completed panels on each side
KP-1506-R2 - Klamath Project; Filling in the last of the required concrete. The 4" X 6" strike-off is almost to the top on the first pass. Later is was put to the bottom and a vibrator inserted in the ...Citation -
KP-1507-R2 - Klamath Project; Using 2" X 4" strike-off, the improvement in the surface, caused by the second pass of the 4" X 6" strike-off, is readily noted above the 2" X 4" strike-off; July 18, 1947; ...
Citation -
KP-1508-R2 - Klamath Project; Using wood bull float after striking off with 2 x 4; Time approximately 1:40 P. M., July 18, 1947; Stacy, contractor; Photo by H. W. Sexton
Citation -
KP-1509-R2 - Klamath Project; Using Fresno float (steel) after bull float; Time approximately 1:44 P. M., July 18, 1947; Stacy, contractor; Photo by H. W. Sexton
Citation -
KP-1510-R2 - Klamath Project. Note Fordson tractor with front end loader just dumping aggregate into batch plant hopper. Crane, batch plant, mixer, etc., located on north and west side of canal. Fordson ...
Citation