Search
You searched for:
Start Over
History
Remove constraint History
Subject
Irrigation canals and flumes -- Design and construction
Remove constraint Subject: Irrigation canals and flumes -- Design and construction
Subject
Irrigation projects
Remove constraint Subject: Irrigation projects
Material Types
Image
Remove constraint Material Types: Image
Database
Klamath Waters Library
Remove constraint Database: Klamath Waters Library
« Previous | 61 - 70 of 241 | Next »
Search Results
-
P12-201-4622NA Same as #4621 above
Citation -
P12-201-4624NA Same as #4625 above
Citation -
63. [Image] "J" Canal Spillway to 46-J Drain
KP-1856 - Klamath Project. P. H. 150 truck crane excavating for structure. C. O. Wamstad in picture; November 15, 1949; Photo by Andrew M. BergloffCitation -
KP-1875 - Klamath Project. J-Canal Wasteway; November 22, 1949; Photo by Andrew M. Bergloff
Citation -
KP-1876 - Klamath Project. J-Canal Wasteway; November 22, 1949; Photo by Andrew M. Bergloff
Citation -
66. [Image] J-1 Lateral Siphon
KP-2113-R2. J-1 Lateral Siphon. Looking upstream showing timber sheeting and cofferdams & 48" corrugated metal pipe for diversion carrying a partial flow of Lost River across the constructions site; March ...Citation -
67. [Image] J-1 Lateral Siphon
KP-2116-R2. J-1 Lateral Siphon. Backfilling of inlet end of barrel section; April 4, 1952; Photo by C. O. WamstadCitation -
68. [Image] Pumping Plant "S"
KP-2140-R2 - Klamath Project. Pumping Plant "S". Sheetpiling and timber work required in the excavation for the intake structure and wells; August 6, 1952; Photo by C. O. WamstadCitation -
69. [Image] Pumping Plant "S"
KP-2141-R2 - Klamath Project. Pumping Plant "S". Bottom of excavation for corrugated metal pipe wells and foundation slab. Piling and rock base being used for foundation due to extremely soft wet foundation ...Citation -
KP-2247-R2 - Klamath Project--Gerber Dam. General view of gate house, pool and new channel constructed below dam; November 12, 1954; Photo by C. O. Wamstad
Citation