Search

You searched for: Start Over Photos Remove constraint Photos Subject Irrigation canals and flumes Remove constraint Subject: Irrigation canals and flumes

Search Results

  • 4729
    CN-12-201-172NA Klamath Project – Oregon. Typical sign on “A” Canal: "No Trespassing - by Order of KID Board” Sign on south bank of “A” Canal - view from west side of Merrill Highway Bridge; September ...
    Citation
  • 212. [Image] Link River Dam
    2802
    KP-2089-R2 - Klamath Project. Link River Dam. Link River, from a point about 1,000 feet downstream, shows Ankeny Canal at right, tailrace in center and Keno Canal at left. Forebay and dam in background. ...
    Citation
  • 213. [Image] Link River Dam
    2803
    KP-2090-R2 - Klamath Project. Link River Dam. Link River from a point about 1,300 feet downstream from the dam. Keno Canal at left. Spillway in center and Ankeny Canal at right; February 7, 1951; Photo ...
    Citation
  • 214. [Image] "A" Canal Intake Works
    3091
    KP-2230-R2 - Klamath Project, "A" Canal Intake Works. General view of gate operating mechanism. Note operating motor in foreground. Control switch can be seen on fence at center of structure which gives ...
    Citation
  • 3102
    KP-2241-R2 - Klamath Project--Main Division. Water came under inner cutoff wall which did not extend below pipe. Gravel backfill and timber under pipe formed a passageway for the water. Trouble had been ...
    Citation
  • 4391
    P12-201-4310 NA Klamath Project, OR-CA. Below broken ice is inlet to 48" CMP which was flooded by earthen dam breaking, causing slide gate on inlet to Center Canal flume to backseat and leak; January ...
    Citation
  • 4392
    P12-201-4311 NA Klamath Project, OR-CA. Center Canal - backflooding against 48" slide gate, causing gate to unseat and allowed flooding of flume inlet transition; January 17, 1977; USBR photo by D. J. ...
    Citation
  • 4393
    P12-201-4312 NA Klamath Project, OR-CA. Center Canal - existing flume outlet, where flooding exited after flowing down entire length of existing flume and flowing into flume pier excavation; January 17, ...
    Citation
  • 4394
    P12-201-4313 NA Klamath Project, OR-CA. Center Canal - Contractor built an earth diversion dam at inlet to 48" CMP turnout located adjacent to flume inlet transition; January 17, 1977; USBR photo by ...
    Citation
  • 4395
    P12-201-4314 NA Klamath Project, OR-CA. Center Canal - Contractor placed electric pump to remove flood water from flume inlet transition; January 17, 1977; USBR photo by D. J. Kline
    Citation