Search
You searched for:
Start Over
Photos
Remove constraint Photos
Subject
Irrigation canals and flumes
Remove constraint Subject: Irrigation canals and flumes
« Previous | 91 - 100 of 276 | Next »
Search Results
-
91. [Image] Lost River Diversion Channel - Sta. 345-00
KP-1993-R2 - Klamath Project. Lost River Diversion Channel. Sta. 345-00. Hole in ponding area showing penetration of moisture into dry diatomaceous earth; July 17, 1950; Photo by Andrew M. BergloffCitation -
92. [Image] Lost River Diversion Channel - Sta 345-00
KP-1994-R2 - Klamath Project. Lost River Diversion Channel. Sta 345-00. Ponding Area on top of dike after absorption of water in pond. George L. Browning inspecting; July 17, 1950; Photo by Andrew ...Citation -
93. [Image] Mossing Operation
KP-2046-R2 - Klamath Project. Mossing Operation. Close-up of pond weed in Lateral as chain cuts weed loose. After cut loose pond weed floats on service of water; August 16, 1950; Photo by Andrew M. ...Citation -
94. [Image] Mossing Operation
KP-2048-R2 - Klamath Project. Mossing Operation. General view showing truck dragline in operation lifting weeds from lateral as they float into a homemade guide; August 16, 1950; Photo by Andrew M. B...Citation -
95. [Image] Mossing Operation
KP-2049-R2 - Klamath Project. Mossing Operation. Close-up of modified sugar cane grapple as it is dropped into lateral for another load of weeds. Picture also shows fence which holds weeds for removal; ...Citation -
96. [Image] Mossing Operation
KP-2050-R2 - Klamath Project. Mossing Operation. Close-up of modified cane grapple just before it is dropped into water. Picture shows the expansion of the fork jaws; August 16, 1950; Photo by Andrew ...Citation -
97. [Image] Mossing Operation
KP-2051-R2 - Klamath Project. Mossing Operation. Close-up of cane grapple removing load of weeds and moss; August 16, 1950; Photo by Andrew M. BergloffCitation -
98. [Image] Mossing Operation
KP-2052-R2 - Klamath Project. Mossing Operation. Dumping weeds and moss from fork to waste pile opposite lateral bank; August 16, 1950; Photo by Andrew M. BergloffCitation -
99. [Image] Mossing Operation
KP-2053-R2 - Klamath Project. Mossing Operation. Dumping weeds and moss from for to waste pile opposite lateral bank; August 16, 1950; Photo by Andrew M. BergloffCitation -
100. [Image] Lower Lost River - Preconstruction picture
KP-2078-R2 - Klamath Project. Lower Lost River. High water in Lost River Channel has caused the 300-foot island between river banks to be flooded. This island is usually farmed; September 14, 1950; Photo ...Citation