Search

You searched for: Start Over Photos Remove constraint Photos Subject Gerber Dam (Oregon) Remove constraint Subject: Gerber Dam (Oregon)

Search Results

  • 211. [Image] Gerber Dam
    5079
    CN-12-201-538NA Klamath Project. View of water "boil" from discharge valves in left abutment area of Gerber Dam. Discharge was about 130 cfs; May 22, 1975; USBR photo by A. L. Bardal
    Citation
  • 212. [Image] Gerber Dam
    5083
    CN-12-201-543NA Klamath Project. View from Dam crest of water flow over Gerber spillway from left side. Spill was 60 cfs.; May 22, 1975; USBR photo by A. L. Bardal
    Citation
  • 5117
    CN-12-201-578NA Klamath Project - Oregon-California. View of downstream face of Gerber Dam. Note new foot­bridge in foreground. Note water flowing over rock weir which was constructed under this specification ...
    Citation
  • 5118
    CN-12-201-579NA Klamath Project - Oregon-California. View of polyurethane coating peeling off of ogee spillway crest of Gerber Dam; June 1974; USBR photo by T. J. Rosten
    Citation
  • 5120
    CN-12-201-580NA Klamath Project - Oregon-California. View of polyurethane coating on ogee spillway crest of Gerber Dam. Note that coating is separating from concrete in center of picture; June 1974; USBR ...
    Citation
  • 5121
    CN-12-201-581NA Klamath Project - Oregon-California. Anchor bolts were embedded in holes to secure drilling platform to face of dam as part of core drilling operations; September 1969; USBR photo by T. ...
    Citation
  • 5124
    CN-12-201-584NA Klamath Project - Oregon-California. Note tripod used by drill crew in obtaining core samples of foundation material. Samples were obtained as part of Safety of Dams review; September ...
    Citation
  • 5127
    CN-12-201-587NA Klamath Project - Oregon-California. This road was constructed to accommodate core drilling operations; September 1969; USBR photo by T. J. Rosten
    Citation
  • 5128
    CN-12-201-588NA Klamath Project - Oregon-California. View of Bucyrus-Erie 22-B dragline used to move drilling platform from place to place on downstream face of dam. Dragline was borrowed from Fish and ...
    Citation
  • 5131
    CN-12-201-591NA Klamath Project - Oregon-California. View of bottom of drilling platform. Note the knee braces used to support the platform; October 1969; USBR photo by C. D. Lawrence
    Citation