Search
You searched for:
Start Over
Photos
Remove constraint Photos
Subject
Excavating machinery
Remove constraint Subject: Excavating machinery
« Previous | 51 - 60 of 92 | Next »
Search Results
-
51. [Image] Norm Swan, USBR employee, excavating for 48" CMP at NW corner of Lot #4, Straits Unit East
P-12-200-4172NA Klamath Project - Oregon-California; April 1976; USBR photo by Bob HamiltonCitation -
52. [Image] KSD Enlargement, Lower Klamath Lake Division, Specs. 200C-922 - Patterson Constr. Co., Contractor
P-12-200-4211NA Klamath Project - Oregon-California. Loader, 966-C, with 4 cu. yd. bucket loading a 20 cu. yd. belly dump with sub-base material for road; July 1976; USBR photo by D. W. SteinCitation -
P12-201-4507 NA Klamath Project, OR-CA. Center Canal Flume -- View showing removal of Center Canal Flume inlet dike after completion of flume repairs. Case 580-C Extend-A-Hoe used for dike removal; January ...
Citation -
P12-201-4533 NA Klamath Project, OR-CA. Pumping Plant FF -- View showing 3500 Manitowoc completing the connection of Klamath Straits Drain to Plant FF's inlet; March 13, 1978; USBR photo by D.J. Kline
Citation -
P12-201-4621NA Klamath Project, OR-CA. C-1-b Lateral, Klamath Straits Drain -- Grad-all 600 fine grading C-1-b Lateral, approximately Sta. 89+00; June 19, 1979; USBR photo by D.J. Kline
Citation -
56. [Image] Closed Drain Construction - Tule Lake Sump 3 - Specs. No. 200C-842, Patterson Constr. Co., Contractor
P12-200-2947NA Klamath Project - Oregon-California. View alongside of trencher showing horizontal alignment staffs. The operator sighted down the poles and was able to obtain very good alignment; December ...Citation -
P-12-200-2964NA Klamath Project - Oregon-California. View of spillway, looking west. The backhoe is excavating the cut-off trench at the downstream toe of the spillway; April 1974; Bureau of Reclamation ...
Citation -
58. [Image] Link River Dam
KP-2185-R2 - Klamath Project. Link River Dam. View of river gate section stilling basin which is under construction by The California-Oregon Power Company. Picture was taken from southeast side of excavation ...Citation -
P12-201-4307 NA Klamath Project, OR-CA. Trimming of side walls at Plant EE to better expedite a ± 1 to 1½/1 slope; December 1976; USBR photo by D. J. Kline
Citation -
P12-201-4308 NA Klamath Project, OR-CA. Gravity hammer 2500 lbs. placing pile to depth of 2-3 feet for further driving to desired depth by air hammer. Soldier pile 1'x1'x16'; December 1976; USBR photo ...
Citation