Search
You searched for:
Start Over
Irrigation
Remove constraint Irrigation
Subject
Excavating machinery
Remove constraint Subject: Excavating machinery
Subject
Irrigation projects
Remove constraint Subject: Irrigation projects
Subject
Klamath Project (U.S.) -- History
Remove constraint Subject: Klamath Project (U.S.) -- History
Material Types
Image
Remove constraint Material Types: Image
« Previous | 1 - 10 of 79 | Next »
Search Results
-
KP-2479-R2 - Klamath Project - TULELAKE IRRIGATION DISTRICT. View looking east showing excavation for drain and excavation for Pumping Plant "V" in background. Drain will carry water supply to pumping ...
Citation -
P12-200-2867NA Klamath Project - Oregon; May 16, 1969; Bureau of Reclamation photo by J. K. Bryant
Citation -
KP-1196-R2 - Klamath Project. Region II. Because of the great demand for food and consequent high prices that can be secured from the sale of produce, it is now possible to bring large areas of land into ...
Citation -
4. [Image] Sump 3, 101-C-6 Drain
KP-2550-R2-Klamath Project - Sump 3, 101-C-6 Drain. View showing second stage in drain excavation. Construction of field dike, shaping of east side of drain done by Tulelake Irrigation District gradall ...Citation -
5. [Image] Construction of M-2-a lateral
KP-1237-R2 - Klamath District - Modoc Unit - Coppeck Bay Area. Building of right bank. View is looking upstream; August 14, 1946; Photo by D. E. GriseCitation -
6. [Image] M-2-a lateral construction
KP-1238-R2 - Klamath District - Modoc Unit - Coppeck Bay Area. The core trench under the left bank is excavated large to furnish sufficient material for building of the right lateral bank after it has ...Citation -
7. [Image] Excavation for Pumping Plant A
KP-1093-R2 - Klamath Project - Tule Lake Division - Modoc Unit; Considerable water was encountered and two 6" and two 10" pumps were required to dewater the hole. After dewatering was completed and the ...Citation -
KP-2637-R2-Klamath Project - TULE LAKE SUMP 2, R-2 Lateral, Specifications DC-5483. Front view of Briscoe ditcher excavating prism of R-2 lateral, Sta. 2+00 after lining has been placed solid across the ...
Citation -
KP-2638-R2-Klamath Project - TULE LAKE SUMP 2, R-2 Lateral Specifications DC-5483. Rear view of Briscoe ditcher excavating prism of R-2 lateral, Station 3+00. Hydraulic cylinders control position of cutting ...
Citation -
10. [Image] Norm Swan, USBR employee, excavating for 48" CMP at NW corner of Lot #4, Straits Unit East
P-12-200-4172NA Klamath Project - Oregon-California; April 1976; USBR photo by Bob HamiltonCitation