Search
You searched for:
Start Over
Irrigation
Remove constraint Irrigation
Subject
Excavating machinery
Remove constraint Subject: Excavating machinery
Subject
Irrigation projects
Remove constraint Subject: Irrigation projects
Subject
Klamath Project (U.S.) -- History
Remove constraint Subject: Klamath Project (U.S.) -- History
Subject
Tule Lake Region (California)
Remove constraint Subject: Tule Lake Region (California)
Material Types
Image
Remove constraint Material Types: Image
« Previous | 1 - 10 of 27 | Next »
Search Results
-
1. [Image] Excavation for Pumping Plant A
KP-1093-R2 - Klamath Project - Tule Lake Division - Modoc Unit; Considerable water was encountered and two 6" and two 10" pumps were required to dewater the hole. After dewatering was completed and the ...Citation -
KP-2637-R2-Klamath Project - TULE LAKE SUMP 2, R-2 Lateral, Specifications DC-5483. Front view of Briscoe ditcher excavating prism of R-2 lateral, Sta. 2+00 after lining has been placed solid across the ...
Citation -
KP-2638-R2-Klamath Project - TULE LAKE SUMP 2, R-2 Lateral Specifications DC-5483. Rear view of Briscoe ditcher excavating prism of R-2 lateral, Station 3+00. Hydraulic cylinders control position of cutting ...
Citation -
4. [Image] TULE LAKE SUMP 2
KP-2540-R2-Klamath Project - TULE LAKE SUMP 2. Pumping Plant X site, view looking northeast. Backhoe excavating Test Pit 11. Material is clay and broken rock; February 27, 1960; Photo by John A. Rennin...Citation -
5. [Image] TULE LAKE SUMP 2
KP-2541-R2-Klamath Project - TULE LAKE SUMP 2. Pumping Plant Y site, view looking west. Backhoe excavating Test Pit 12. Material consists of clay and boulders; Febriary 27, 1960; Photo by John A. Renni...Citation -
KP-2465-R2 - Klamath Project--TULE LAKE DRAINAGE EXPERIMENT, LOT 23, LEASE AREA B-1. Looking west on Line "B", showing trenching machine excavating trench for 6-inch concrete pipe; April 30, 1958; Photo ...
Citation -
P12-200-2910NA Klamath Project - Oregon-California. View of trencher starting to excavate a drain line. The hopper and digging unit are dropped into place at the outlet of the proposed line. Then, the ...
Citation -
P12-200-2911NA Klamath Project - Oregon-California. It bacame [sic] necessary to scrape the snow away from the front of the trenching machine because of its high flotation. The maching was unable to ...
Citation -
P12-200-2912NA Klamath Project - Oregon-California. View of trenching machine and hopper unit being moved from a completed drain line to another field; December 1972; Bureau of Reclamation photo by ...
Citation -
10. [Image] Closed Drain Construction - Tule Lake Sump 3 - Specs. No. 200C-842, Patterson Constr. Co., Contractor
P12-200-2913NA Klamath Project - Oregon-California. Close-up view of digging chain prior to starting a new drain line. The hopper unit and trencher were backed up to an open collector drain, lowered ...Citation