Search
You searched for:
Start Over
History
Remove constraint History
Subject
Excavating machinery
Remove constraint Subject: Excavating machinery
Subject
Irrigation projects
Remove constraint Subject: Irrigation projects
Subject
Klamath Project (U.S.) -- History
Remove constraint Subject: Klamath Project (U.S.) -- History
Subject
Trenches
Remove constraint Subject: Trenches
Subject
Tule Lake Sump (California)
Remove constraint Subject: Tule Lake Sump (California)
Database
Klamath Waters Library
Remove constraint Database: Klamath Waters Library
« Previous | 1 - 10 of 14 | Next »
Search Results
-
P12-200-2877A Tule Lake Area - Sump 3 - Klamath Project - California. Note contractor's employee preparing to check grade with grade rod from stringline. Baumgardner Excavating. Specs. No. 200C-778; ...
Citation -
P12-200-2910NA Klamath Project - Oregon-California. View of trencher starting to excavate a drain line. The hopper and digging unit are dropped into place at the outlet of the proposed line. Then, the ...
Citation -
P12-200-2911NA Klamath Project - Oregon-California. It bacame [sic] necessary to scrape the snow away from the front of the trenching machine because of its high flotation. The maching was unable to ...
Citation -
P12-200-2915NA Klamath Project - Oregon-California. View of operator's control panel mounted on Hoes Gigant trenching machine; December 1972; Bureau of Reclamation photo by D. W. Stein
Citation -
P12-200-2916NA Klamath Project - Oregon-California. View of trenching equipment in operation; December 1972; Bureau of Reclamation photo by D. W. Stein
Citation -
P12-200-2917NA Klamath Project - Oregon-California. View of trenching equipment. The trencher is almost at the end of a newly installed closed drain line. Note the workman threading a short section of ...
Citation -
P12-200-2919NA Klamath Project - Oregon-California. View of pipe trenching equipment in operation; November 1972; Bureau of Reclamation photo by D. W. Stein
Citation -
P12-200-2920NA Klamath Project - Oregon-California. Inspector Derrill Stein is shown in foreground. He is watching the construction operation to see that the work performed by the contractor meets the ...
Citation -
P12-200-2921NA Klamath Project - Oregon-California. Side view of trenching equipment in operation. Note how the plastic drainage tubing is stretched out in advance of the trenching machine; November ...
Citation -
10. [Image] Closed Drain Construction - Tule Lake Sump 3 - Specs. No. 200C-842, Patterson Constr. Co., Contractor
P12-200-2922NA Klamath Project - Oregon-California. View of trenching machine. Hopper unit and digging chain have been lifted out of ground; November 1972; Bureau of Reclamation photo by D. W. Stein...Citation