Search

You searched for: Start Over Development Remove constraint Development Subject ENERGY Remove constraint Subject: ENERGY Database Klamath Waters Library Remove constraint Database: Klamath Waters Library

Search Results

  • 10365
    The Workshop Proceedings of the Susanville Geothermal Energy Project have been prepared as the Final Technical Report under Contract AT (04-3)-1077 between the U. S. Energy Research and Development Administration ...
    Citation
  • 1116
    Economically feasible uses for geothermal heat at temperatures too low for conventional electrical power generation at present are delineated. Several geothermal resource areas in northern California that ...
    Citation
  • 7
    The status of the engineering and economic feasibility study of utilizing geothermal energy for the mining and processing of tungsten ore at the Union Carbide-Metals Division Pine Creek tungsten complex ...
    Citation
  • 8
    The completed geochemical analysis of groundwater in the Pine Creek area for evaluation of the geothermal potential of this location is presented. Also included is an environmental constraints analysis ...
    Citation
  • 9
    The engineering, economic, and environmental feasibility of the use of low and moderate temperature geothermal heat in the mining and processing of tungsten ore is explored. The following are covered: ...
    Citation
  • 39
    The technical and economic feasibility of using hydrothermal resources as a primary power source for both existing and future aluminum reduction plants in the United States is explored. Applicable hydrothermal ...
    Citation
  • 64
    To utilize the geothermal energy in the area of its 30,000-head cattle feedlot, J.A. Albertson Land and Cattle Co. is considering the development of an integrated geothermal/bioconversion system that would ...
    Citation
  • 4701
    Efforts continued to carry forward policy development in existing project states. Follow-up contacts were made with most project states, and state visits and meetings occurred in eight project states. ...
    Citation
  • 5834
    Near-term and long-term supply curves are presented for electric applications of geothermal energy. The GEOCOST model was used to determine the present and future energy production costs for the high-temperature ...
    Citation
  • 10349
    A multi-use, integrated project plan has been developed for the combined electrical and direct utilization of an intermediate temperature geothermal resource. This concept addresses an integrated project ...
    Citation