Search

You searched for: Start Over Irrigation Remove constraint Irrigation Subject Drainage pipes Remove constraint Subject: Drainage pipes Subject Klamath Project (U.S.) -- History Remove constraint Subject: Klamath Project (U.S.) -- History Subject Tule Lake Region (California) Remove constraint Subject: Tule Lake Region (California)

Search Results

  • 3918
    P12-200-2907NA Klamath Project - Oregon-California. View of pipe laying operation. Note relationship of trenching machine to dump truck; December 1972; Bureau of Reclamation photo by D. W. Stein
    Citation
  • 3919
    P12-200-2908NA Klamath Project - Oregon-California. View of Hoes Gigant trencher operating in cold weather; December 1972; Bureau of Reclamation photo by D. W. Stein
    Citation
  • 3920
    P12-200-2909NA Klamath Project - Oregon-California. View of contractor's equipment. Cinders are fed into conveyor belt from dump truck and then into the hopper unit mounted on the back of the trenching ...
    Citation
  • 3921
    P12-200-2910NA Klamath Project - Oregon-California. View of trencher starting to excavate a drain line. The hopper and digging unit are dropped into place at the outlet of the proposed line. Then, the ...
    Citation
  • 3928
    P12-200-2917NA Klamath Project - Oregon-California. View of trenching equipment. The trencher is almost at the end of a newly installed closed drain line. Note the workman threading a short section of ...
    Citation
  • 3929
    P12-200-2918NA Klamath Project - Oregon-California. View of digging and hopper unit being raised out of the open trench at the end of a completed drain line; November 1972; Bureau of Reclamation photo ...
    Citation
  • 3930
    P12-200-2919NA Klamath Project - Oregon-California. View of pipe trenching equipment in operation; November 1972; Bureau of Reclamation photo by D. W. Stein
    Citation
  • 3931
    P12-200-2920NA Klamath Project - Oregon-California. Inspector Derrill Stein is shown in foreground. He is watching the construction operation to see that the work performed by the contractor meets the ...
    Citation
  • 3932
    P12-200-2921NA Klamath Project - Oregon-California. Side view of trenching equipment in operation. Note how the plastic drainage tubing is stretched out in advance of the trenching machine; November ...
    Citation
  • 3939
    P12-200-2928NA Klamath Project - Oregon-California. View of contractor's workers threading plastic drainage tubing into hopper unit; November 1972; Bureau of Reclamation photo by D. W. Stein
    Citation