Search
You searched for:
Start Over
Irrigation
Remove constraint Irrigation
Subject
Drainage
Remove constraint Subject: Drainage
Subject
Excavating machinery
Remove constraint Subject: Excavating machinery
Subject
Klamath Project (U.S.) -- History
Remove constraint Subject: Klamath Project (U.S.) -- History
Material Types
Image
Remove constraint Material Types: Image
« Previous | 1 - 10 of 24 | Next »
Search Results
-
KP-2479-R2 - Klamath Project - TULELAKE IRRIGATION DISTRICT. View looking east showing excavation for drain and excavation for Pumping Plant "V" in background. Drain will carry water supply to pumping ...
Citation -
2. [Image] Sump 3, 101-C-6 Drain
KP-2550-R2-Klamath Project - Sump 3, 101-C-6 Drain. View showing second stage in drain excavation. Construction of field dike, shaping of east side of drain done by Tulelake Irrigation District gradall ...Citation -
3. [Image] M-2-a lateral construction
KP-1238-R2 - Klamath District - Modoc Unit - Coppeck Bay Area. The core trench under the left bank is excavated large to furnish sufficient material for building of the right lateral bank after it has ...Citation -
4. [Image] Norm Swan, USBR employee, excavating for 48" CMP at NW corner of Lot #4, Straits Unit East
P-12-200-4172NA Klamath Project - Oregon-California; April 1976; USBR photo by Bob HamiltonCitation -
P12-201-4605NA Klamath Project, OR-CA. S-16 Drain, Klamath Straits Unit West -- Photo of S-16 looking west shows Gradall 600 shaping south 2:1 slope; April 23, 1979; USBR photo by D.J. Kline
Citation -
6. [Image] Bank Failure - Klamath Straits Drain
P12-200-2891A Klamath Project - Oregon-California. View showing repair of washout at Sta. 591+50, looking north; August 1970; Bureau of Reclamation photo by D. W. SteinCitation -
P12-200-2912NA Klamath Project - Oregon-California. View of trenching machine and hopper unit being moved from a completed drain line to another field; December 1972; Bureau of Reclamation photo by ...
Citation -
P12-200-2913NA Klamath Project - Oregon-California. Close-up view of digging chain prior to starting a new drain line. The hopper unit and trencher were backed up to an open collector drain, lowered ...
Citation -
P12-200-2914NA Klamath Project - Oregon-California. View of trencher unit beginning a new drain line. Note plastic pipe in hopper unit. It was left there to keep chute from filling up with dirt and cinders ...
Citation -
10. [Image] Closed Drain Construction - Tule Lake Sump 3 - Specs. No. 200C-842, Patterson Constr. Co., Contractor
P12-200-2915NA Klamath Project - Oregon-California. View of operator's control panel mounted on Hoes Gigant trenching machine; December 1972; Bureau of Reclamation photo by D. W. SteinCitation