Search

You searched for: Start Over Photos Remove constraint Photos Subject Draglines Remove constraint Subject: Draglines

Search Results

  • 3800
    P12-200-2793A Klamath River - Klamath Project--Oregon. View from existing Keno regulating dam showing M-K Co. dragline removing blasted rock from by-pass channel. Equipment at right is on old spoil pile, ...
    Citation
  • 3801
    P12-200-2794A Klamath River - Klamath Project--Oregon. Trench is to drain overburden to facilitate excavation; March 3, 1965; Bureau of Reclamation photo by C. D. Lawrence
    Citation
  • 3805
    P12-200-2798A Klamath River - Klamath Project--Oregon. View north shows dozer and dragline excavation in unusual section just downstream from axis of existing dike and dam--the only section not requiring ...
    Citation
  • 3809
    P12-200-2799A Klamath River - Klamath Project--Oregon. Existing river channel is in background at inlet end of the by-pass channel. Note Keno River bridge in distant background; March 11, 1965; Bureau ...
    Citation
  • 3823
    P12-200-2818A J-Canal Repair - Klamath Project - Oregon California. Emergency repair of damage to "J" Canal lining Specs. 200C-584, Contractor Patterson Construction Co. View near north Sta. 860+ shows ...
    Citation
  • 3835
    P12-200-2826NA Flood Damage Repair in Langell Valley - Klamath Project - Oregon - California. Specs. 200C-591, Contractor - Patterson Construction Co. Model LS-85 dragline reshaping overflow drain spillway ...
    Citation
  • 3840
    P12-200-2831NA Flood Damage in Langell Valley - Klamath Project - Oregon - California. Specs. 200C-591, Contractor - Patterson Construction Co. LS-85 dragline shaping riprap at Willow Valley Drainage ...
    Citation
  • 3846
    P12-200-2836NA Flood Damage Repair in Langell Valley - Klamath Project - Oregon - California. Linkbelt dragline excavating the bottom section of Miller Creek Channel, Sta. 8+50, looking downstream. Casting ...
    Citation
  • 3849
    P12-200-2839NA Removal of Flood Debris from Tulelake Drains - Sump 2 Area - Klamath Project - Oregon - California. 102-C-1 Drain looking south, taken from intersection of 102-D Drain. 22-B dragline with ...
    Citation
  • 3851
    P12-200-2841NA Removal of Flood Debris from open drain ditches in the Tulelake Area - Sump 2 - Klamath Project - Oregon - California. Contractor - Francis D. Brown and Son, Inc. 22-B dragline excavating ...
    Citation