Search

Search Results

  • 3867
    P12-200-2857NA Lost River Diversion Dam, Klamath Project, Ore.-Cal. Original timber covering the basin floor and concrete in overflow structure were in excellent condition. Two to three inches of ice ...
    Citation
  • 3868
    P12-200-2858NA Lost River Diversion Dam, Klamath Project, Ore.-Cal. The five-man Regional Diving Team "warming up" after completion of stilling basin and downstream apron inspection. Left to right: T. ...
    Citation
  • 3865
    P12-200-2855NA Pumping Plant F., Klamath Project, Oregon-California. Fabricated float stop that was installed over lower end of float well pipe in Unit 1 of pumping plant. Inside dimensions of clamp ...
    Citation
  • 3856
    P12-200-2846NA Gerber Dam, Klamath Project, Oregon-California. Team members from left to right: G. W. Fuller, civil engineer; J. L. Andrews, structural engineer; B. H. Carter, geologist; T. J. Spicher, ...
    Citation