Search
You searched for:
Start Over
Photos
Remove constraint Photos
Subject
Dikes (Engineering) -- Design and construction
Remove constraint Subject: Dikes (Engineering) -- Design and construction
Material Types
Image
Remove constraint Material Types: Image
« Previous | 1 - 10 of 21 | Next »
Search Results
-
1. [Image] Clear Lake Spillway Rehabilitation - Specs. 200C-889 - Roy D. Garren Corporation, Contractor
P-12-200-2989NA Klamath Project - Oregon-California. View of completed dike. Roy Garren is shown in the photo. Note the neat appearance of the riprap; May 1974; Bureau of Reclamation photo by D. W. ...Citation -
KP-1114-R2 - Klamath Project; Dike constructed by Lewis S. Kandra as a part of his lease agreement; April 17, 1945; Photo by R. S. Hopkins
Citation -
3. [Image] Sump 3, 101-C-6 Drain
KP-2550-R2-Klamath Project - Sump 3, 101-C-6 Drain. View showing second stage in drain excavation. Construction of field dike, shaping of east side of drain done by Tulelake Irrigation District gradall ...Citation -
P-12-200-4149NA Klamath Project - Oregon-California. Widening and Deepening of Center Govt. Drain by USBR, Using FWS Bucyrus-Erie Dragline w/½ cu. yd. Bucket, Klamath Straits Unit-East. Dike Created ...
Citation -
P-12-200-4151NA Klamath Project - Oregon-California. Widening and Deepening of Center Govt. Drain by USBR, Using FWS Bucyrus-Erie Dragline w/½ cu. yd. Bucket, Klamath Straits Unit-East. Dragline dumping ...
Citation -
P12-201-4610NA Klamath Project, OR-CA. 'A' Dike #16, Klamath Straits Unit West -- Test excavation of 'A' Dike #10 with 627 B scrapers. With the sandy soil found here, the scrapers were able to excavate ...
Citation -
7. [Image] Clear Lake Spillway Rehabilitation - Specs. 200C-889 - Roy D. Garren Corporation, Contractor
P-12-200-2980NA Klamath Project - Oregon-California. View of small dike being constructed at south end of Clear Lake Reservoir, looking west. Dike is being compacted by means of loaded sheep's-foot roller, ...Citation -
8. [Image] Clear Lake Spillway Rehabilitation - Specs. 200C-889 - Roy D. Garren Corporation, Contractor
P-12-200-2981NA Klamath Project - Oregon-California. View showing contractor dozing up surface rock along edge of water to be used as riprap on small dike; May 1974; Bureau of Reclamation photo by D. ...Citation -
9. [Image] Clear Lake Spillway Rehabilitation - Specs. 200C-889 - Roy D. Garren Corporation, Contractor
P-12-200-2983NA Klamath Project - Oregon-California. View showing link belt 22-B dragline placing and shaping riprap on dike; May 1974; Bureau of Reclamation photo by D. W. SteinCitation -
10. [Image] Clear Lake Spillway Rehabilitation - Specs. 200C-889 - Roy D. Garren Corporation, Contractor
P-12-200-2984NA Klamath Project - Oregon-California. View of small dike under construction, looking westerly. Earth fill is completed, and stock piling of riprap is stock-piled along the sides of the ...Citation