Search

You searched for: Start Over Photos Remove constraint Photos Subject Dams -- Maintenance and repair Remove constraint Subject: Dams -- Maintenance and repair

Search Results

  • 4072
    P-12-200-3059NA Klamath Project - Oregon-California. View of completed spillway, looking west. Note fencing at right and left walls; June 1974; USBR photo by D. W. Stein
    Citation
  • 4073
    P-12-200-3060NA Klamath Project - Oregon-California. View of spillway, from right wall, looking west. Note that the drain hole is weeping; June 1974; USBR photo by D. W. Stein
    Citation
  • 4074
    P-12-200-3061NA Klamath Project - Oregon-California. View of right wall, looking north. Fencing is in place; June 1974; USBR photo by D. W. Stein
    Citation
  • 124. [Image] Link River Dam
    2982
    KP-2183-R2 - Klamath Project. Link River Dam. Close-up view finishes panorama of old apron on downstream side of the river gate section. Picture was taken from within stilling basin. Construction by The ...
    Citation
  • 125. [Image] Link River Dam
    2984
    KP-2185-R2 - Klamath Project. Link River Dam. View of river gate section stilling basin which is under construction by The California-Oregon Power Company. Picture was taken from southeast side of excavation ...
    Citation
  • 126. [Image] Link River Dam
    2987
    KP-2188-R2 - Klamath Project. Link River Dam. River Outlet Stilling Basin. General view of diffuser blocks. Personnel from The California-Oregon Power Company are: Gilbert W. Fleet, Ass't Supt., Marion ...
    Citation
  • 4854
    CN-12-201-307NA Klamath Project - Oregon-California. High pressure pump (200 psi, 5 gpm) used in cleaning up­stream face of the dam. Pressure used was 800 psi; November 1973; Bureau of Reclamation photo ...
    Citation
  • 4855
    CN-12-201-308NA Klamath Project - Oregon-California. Workman cleaning face of dam with high pressure water spray. Note cleaned area and dirt and pollen rings; November 1973; Bureau of Reclamation photo ...
    Citation
  • 4857
    CN-12-201-310NA Klamath Project - Oregon-California. Deteriorated construction joint on upstream face of dam. Main cause of deterioration in this particular joint is water collected on walkway of dam ...
    Citation
  • 4858
    CN-12-201-311NA Klamath Project - Oregon-California. Workman cleaning face of dam with high pressure water spray; November 1973; Bureau of Reclamation photo by J. A. Renning
    Citation