Search
You searched for:
Start Over
Dams
Remove constraint Dams
Subject
Dams
Remove constraint Subject: Dams
Subject
Klamath Project (U.S.) -- History
Remove constraint Subject: Klamath Project (U.S.) -- History
Material Types
Image
Remove constraint Material Types: Image
Database
Klamath Waters Library
Remove constraint Database: Klamath Waters Library
« Previous | 121 - 130 of 179 | Next »
Search Results
-
121. [Image] Gerber Dam
CN-12-201-531NA Klamath Project. View of walkway over Miller Creek below Gerber Dam, taken from right abutment. Flow was 190 cfs in Miller Creek; May 22, 1975; USBR photo by A. L. BardalCitation -
122. [Image] Gerber Dam
CN-12-201-538NA Klamath Project. View of water "boil" from discharge valves in left abutment area of Gerber Dam. Discharge was about 130 cfs; May 22, 1975; USBR photo by A. L. BardalCitation -
KP-1 - Aerial photograph of the proposed Lower Lost River Channel Improvement. Looking almost straight East down on the Lower Lost River Diversion Dam showing the J-Canal and the first bend of Lost River ...
Citation -
124. [Image] Gerber Dam Core Drilling Program
CN-12-200-45A Klamath Project, Oregon-California. Panoramic view of core drilling operation from west walkway on top of dam; October 1969; Bureau of Reclamation photo by C.D.LawrenceCitation -
125. [Image] Gerber Dam Core Drilling Program
CN-12-200-47A Klamath Project, Oregon-California. View of bucket of concrete being lowered from walkway on top of dam to drilling platform. The concrete was used to fill the core holes after the cores ...Citation -
126. [Image] Gerber Dam Core Drilling Program
CN-12-200-52A Klamath Project, Oregon-California. View of core drill just before the drill was started. Note the drill barrel has not yet penetrated the dam; October 1969; Bureau of Reclamation photo ...Citation -
127. [Image] Gerber Dam Core Drilling Program
CN-12-200-55A Klamath Project, Oregon-California. View of core drilling platform from east walkway on top of dam. Note the core sample stored in box at rear of platform; October 1969; Bureau of Reclamation ...Citation -
128. [Image] Link River Dam
KP-2184-R2 - Klamath Project. Link River Dam. View of existing concrete apron of river gate section, also the agglomerate foundation material underneath apron. Looking upstream at almost the entire river ...Citation -
129. [Image] Gerber Dam, showing four leaks
KP-2214-R2 - Klamath Project, Gerber Dam. Downstream face showing remaining four leaks after neoprene repairs to joints on upstream face. Arrow indicates approximate location of reported 5th leak. Flow ...Citation -
P12-200-2778A Klamath River - Klamath Project--Oregon. Note old timber construction and timber needles stacked on deck; January 26, 1965; Bureau of Reclamation photo by C. D. Lawrence
Citation