Search

Search Results

  • 1. [Image] Link River Dam
    3027
    No. 4 - Klamath Project. Link River Dam. Photo taken northerly of portion of the Dam. Shows new spillway and stilling basin as constructed in 1952. Photo shows 2800 cfs spill on Feb. 10 at time of photo. ...
    Citation
  • 2. [Image] Link River Dam
    3029
    No. 6 - Klamath Project. Link River Dam. Photo taken southerly and downstream from the Dam. Shows portion of east wall of new spill section constructed. Spill of 1680 cfs at time of photo; February 4, ...
    Citation
  • 3. [Image] Link River Dam
    2801
    KP-2088-R2 - Klamath Project. Link River Dam. Link River, from a point about 1,400 feet upstream from the dam. Narrows in foreground. Forebay, dam and left bank in background. Eddies and current from narrows ...
    Citation
  • 4. [Image] Link River Dam
    2832
    KP-2119 & 2120-R2. Link River Dam. General view of river section just downstream from dam. 3,888 cfs being released. Gate openings from right end of dam. River gate No. 1 - 7 ft.; No. 2 - 4 ft.; stoplog ...
    Citation
  • 3795
    P12-200-2789A Link River Dam - Klamath Project--Oregon-California. View from right bank downstream, showing discharge of about 6500 cfs., from Upper Klamath Lake to Link River; January 28, 1965; Bureau ...
    Citation
  • 6. [Image] Link River Dam
    3025
    No. 2 - Klamath Project. Link River Dam. Photo taken southeasterly of new spillway and stilling section as constructed in1952. Elevation at time of photo, 4142.1; February 4, 1953 at 3:30 p.m.; Photo by ...
    Citation
  • 7. [Image] Link River Dam
    3026
    No. 3 - Klamath Project. Link River Dam. Photo taken southeasterly of spill section and stilling basin. 1680 cfs spill at time of photo; February 4, 1953 at 3:30 p.m.; Photo by The California-Oregon Power ...
    Citation
  • 8. [Image] Link River Dam
    3088
    KP-2227-R2 - Klamath Project, Link River Dam. Downstream view showing stilling basin and training walls recently completed. California Projects; July 15, 1953; Photo by Donald M. Westphal
    Citation
  • 9. [Image] Link River Dam
    3089
    KP-2228-R2 - Klamath Project, Link River Dam. Close-up view of stilling basin in operation. Training walls and stilling basin constructed and completed December 1952 by California-Oregon Power Company. ...
    Citation
  • 10. [Image] Link River Dam
    2802
    KP-2089-R2 - Klamath Project. Link River Dam. Link River, from a point about 1,000 feet downstream, shows Ankeny Canal at right, tailrace in center and Keno Canal at left. Forebay and dam in background. ...
    Citation