Search

You searched for: Start Over Irrigation Remove constraint Irrigation Subject Dams Remove constraint Subject: Dams Subject Irrigation canals and flumes Remove constraint Subject: Irrigation canals and flumes Subject Klamath Project (U.S.) -- History Remove constraint Subject: Klamath Project (U.S.) -- History

Search Results

  • 1. [Image] Lost River Dam
    3085
    KP-2225-R2 - Klamath Project, Lost River Dam. Downstream view of headworks for Lost River Diversion Channel. California Projects; July 15, 1953; Photo by Donald M. Westphal; Duplicate KP number
    Citation
  • 2. [Image] Lost River Dam
    3086
    KP-2225-R2 - Klamath Project, Lost River Dam. Downstream view of headworks for Lost River Diversion Channel. California Projects; July 15, 1953; Photo by Donald M. Westphal; Duplicate KP number
    Citation
  • 3. [Image] Gerber Dam
    3103
    KP-2242-R2 - Klamath Project--Gerber Dam. General downstream view showing old existing outlet channel along the face of dam; May 26, 1954; Photo by C. O. Wamstad
    Citation
  • 2559
    KP-1969-Klamath Project. Lower Lost River Diversion Dam. The picture shows the north wingwall of dam protecting the J-Canal Diversion Channel, also showing outlet of dam. Smith Ketchum and Luke McAnulty ...
    Citation
  • 5. [Image] Link River Dam
    2802
    KP-2089-R2 - Klamath Project. Link River Dam. Link River, from a point about 1,000 feet downstream, shows Ankeny Canal at right, tailrace in center and Keno Canal at left. Forebay and dam in background. ...
    Citation
  • 6. [Image] Link River Dam
    2803
    KP-2090-R2 - Klamath Project. Link River Dam. Link River from a point about 1,300 feet downstream from the dam. Keno Canal at left. Spillway in center and Ankeny Canal at right; February 7, 1951; Photo ...
    Citation
  • 4394
    P12-201-4313 NA Klamath Project, OR-CA. Center Canal - Contractor built an earth diversion dam at inlet to 48" CMP turnout located adjacent to flume inlet transition; January 17, 1977; USBR photo by ...
    Citation