Search

Search Results

  • 5202
    CN-12-200-48A Klamath Project, Oregon-California. Picture of Bud Fehlhaber, driller's helper, removing core sample from drill hole; October 1969; Bureau of Reclamation photo by C.D.Lawrence
    Citation
  • 5203
    CN-12-200-50A Klamath Project, Oregon-California. View of blocking beneath the outer end of the drilling platform. Blocking was used in those places where the knee braces would not fit beneath the platform; ...
    Citation
  • 5204
    CN-12-200-52A Klamath Project, Oregon-California. View of core drill just before the drill was started. Note the drill barrel has not yet penetrated the dam; October 1969; Bureau of Reclamation photo ...
    Citation
  • 5206
    CN-12-200-53A Klamath Project, Oregon-California. View of core drilling platform being lowered into desired position above gate house. Platform was moving when the picture was taken; October 1969; Bureau ...
    Citation
  • 5208
    CN-12-200-55A Klamath Project, Oregon-California. View of core drilling platform from east walkway on top of dam. Note the core sample stored in box at rear of platform; October 1969; Bureau of Reclamation ...
    Citation
  • 3074
    KP-2214-R2 - Klamath Project, Gerber Dam. Downstream face showing remaining four leaks after neoprene repairs to joints on upstream face. Arrow indicates approximate location of reported 5th leak. Flow ...
    Citation
  • 3856
    P12-200-2846NA Gerber Dam, Klamath Project, Oregon-California. Team members from left to right: G. W. Fuller, civil engineer; J. L. Andrews, structural engineer; B. H. Carter, geologist; T. J. Spicher, ...
    Citation