Search

Search Results

  • 3115
    KP-2254-R2 - Klamath Project--Gerber Dam. Deepest part of pool below center part of spillway - about 4' deep. Shows no erosion of concrete on face of dam; November 12, 1954; Photo by C. O. Wamstad
    Citation
  • 3116
    KP-2255-R2 - Klamath Project--Gerber Dam. Spalling of concrete on each side of slot at about gate house floor level. No seepage is evident; November 12, 1954; Photo by C. O. Wamstad
    Citation
  • 3117
    KP-2256-R2 - Klamath Project--Gerber Dam. Right side of gate house showing seep in corner about 1' below floor level; November 12, 1954; Photo by C. O. Wamstad
    Citation
  • 3855
    P12-200-2845NA - Gerber Dam, Klamath Project, Oregon-California. Reservoir surface covered with 14 inches of ice. Overflow spillway crest in background. From left to right: B. H. Carter, J. L. Andrews, ...
    Citation
  • 3859
    P12-200-2849NA Gerber Dam, Klamath Project, Oregon-California. View from top of dam looking down at access hole in ice, water surface elevation 1823.2. First divers returning after removing timber cover ...
    Citation
  • 76. [Image] Gerber Dam
    5070
    CN-12-201-531NA Klamath Project. View of walkway over Miller Creek below Gerber Dam, taken from right abutment. Flow was 190 cfs in Miller Creek; May 22, 1975; USBR photo by A. L. Bardal
    Citation
  • 77. [Image] Gerber Dam
    5079
    CN-12-201-538NA Klamath Project. View of water "boil" from discharge valves in left abutment area of Gerber Dam. Discharge was about 130 cfs; May 22, 1975; USBR photo by A. L. Bardal
    Citation
  • 5198
    CN-12-200-45A Klamath Project, Oregon-California. Panoramic view of core drilling operation from west walkway on top of dam; October 1969; Bureau of Reclamation photo by C.D.Lawrence
    Citation
  • 5199
    CN-12-200-44A Klamath Project, Oregon-California. View of core drilling platform. Drill is operating. Chet Gore, Chief Engineer's Office, is standing beside drill; October 1969; Bureau of Reclamation ...
    Citation
  • 5201
    CN-12-200-47A Klamath Project, Oregon-California. View of bucket of concrete being lowered from walkway on top of dam to drilling platform. The concrete was used to fill the core holes after the cores ...
    Citation