Search

Search Results

  • 3111
    KP-2250-R2 - Klamath Project--Gerber Dam; November 12, 1954; Photo by C. O. Wamstad
    Citation
  • 3112
    KP-2251-R2 - Klamath Project--Gerber Dam. Downstream face of gate structure, showing bottom and left side of pool. Mr. Elmore standing on concrete extending out into bottom pool below gates; November 12, ...
    Citation
  • 3113
    KP-2252-R2 - Klamath Project--Gerber Dam. Shows minor erosion of concrete on outer face of structure at edge of bevel - about 3" deep; November 12, 1954; Photo by C. O. Wamstad
    Citation
  • 3114
    KP-2253-R2 - Klamath Project--Gerber Dam; November 12, 1954; Photo by C. O. Wamstad
    Citation
  • 3116
    KP-2255-R2 - Klamath Project--Gerber Dam. Spalling of concrete on each side of slot at about gate house floor level. No seepage is evident; November 12, 1954; Photo by C. O. Wamstad
    Citation
  • 3117
    KP-2256-R2 - Klamath Project--Gerber Dam. Right side of gate house showing seep in corner about 1' below floor level; November 12, 1954; Photo by C. O. Wamstad
    Citation
  • 2553
    KP-1963-Klamath Project. Same as No. 1962. Bill Biggs and Smith Ketchum inspecting; June, 6, 1950; Photo by Andrew M. Bergloff
    Citation
  • 3856
    P12-200-2846NA Gerber Dam, Klamath Project, Oregon-California. Team members from left to right: G. W. Fuller, civil engineer; J. L. Andrews, structural engineer; B. H. Carter, geologist; T. J. Spicher, ...
    Citation
  • 3855
    P12-200-2845NA - Gerber Dam, Klamath Project, Oregon-California. Reservoir surface covered with 14 inches of ice. Overflow spillway crest in background. From left to right: B. H. Carter, J. L. Andrews, ...
    Citation
  • 3857
    P12-200-2847NA Gerber Dam, Klamath Project, Oregon=California. First team of divers, with standby diver and line tenders, preparing for examination of trashrack area. Note "downline" in center of picture ...
    Citation