Search

You searched for: Start Over Irrigation Remove constraint Irrigation Subject Cranes, derricks, etc. Remove constraint Subject: Cranes, derricks, etc. Subject Klamath Straits Drain (Oregon) Remove constraint Subject: Klamath Straits Drain (Oregon)

Search Results

  • 2307
    KP-1809-R2; June 29, 1949; Photo by Hugh P. Crawford
    Citation
  • 4571
    P12-201-4489 NA Klamath Project, OR-CA. Second piece of RCP a 16' tangent is lowered into pipe trench by both 3500 Manitowo and 35 ton Manitowol. Two (2) cranes were required because the 3500 had only ...
    Citation
  • 4573
    P12-201-4491 NA Klamath Project, OR-CA. First sections of 24" RCP arrived today. Here a 15° mitre joint is being lifted off lowboy by 3500 Manitowoc; Dec. 2, 1977; USBR photo by D.J. Kline
    Citation
  • 4537
    P12-201-4455 NA Klamath Project, OR-CA. Ady Canal--View of siphon pipe laying operation looking from hwy. west toward RR. Pettibone 30 Multicrane used for lifting; September 1977; USBR photo by D.J. ...
    Citation
  • 4578
    P12-201-4496 NA Klamath Project, OR-CA. Crossing completed and 3500 on its way to PP FF; Nov. 28, 1977; USBR photo by D.J. Kline
    Citation
  • 4579
    P12-201-4497 NA Klamath Project, OR-CA. 3500 Manitowoc leaving PP EE. This crossing is located on east bank of drain enlargement just north of PP EE outlet transition. This area was of concern due to ...
    Citation
  • 4581
    P12-201-4499 NA Klamath Project, OR-CA. Pumping Plant FF -- 3500 Manitowoc preparing to unload a section of 84" RCP from lowbow (sic). Note TD-20 cat in position to pull lowboy out of trench when load ...
    Citation
  • 4383
    P-12-201-4302 NA Klamath Project, OR-CA. Crane moving to second landing to complete second half of Plant EE excavation. View Looking east; December 1976; USBR photo by D. J. Kline
    Citation
  • 4418
    P12-201-4336 NA Klamath Project, OR-CA. Pumping Plant FF-completed bridge with P&H670 crane on end of bridge. Note: Guard rail around outside perimeter of construction bridge with 14"x14" curving on bridge ...
    Citation
  • 4444
    P12-201-4362 NA Klamath Project, OR-CA. Plant FF - Driving 1:2 batter piles at plant FF site. Manitowoc 2900 crane with 90 ft. leads using 50-C hammer, driven by Clayton Steam Generator. View looking ...
    Citation