Search Results
-
P12-201-4489 NA Klamath Project, OR-CA. Second piece of RCP a 16' tangent is lowered into pipe trench by both 3500 Manitowo and 35 ton Manitowol. Two (2) cranes were required because the 3500 had only ...
Citation -
P12-201-4491 NA Klamath Project, OR-CA. First sections of 24" RCP arrived today. Here a 15° mitre joint is being lifted off lowboy by 3500 Manitowoc; Dec. 2, 1977; USBR photo by D.J. Kline
Citation -
P12-201-4455 NA Klamath Project, OR-CA. Ady Canal--View of siphon pipe laying operation looking from hwy. west toward RR. Pettibone 30 Multicrane used for lifting; September 1977; USBR photo by D.J. ...
Citation -
P12-201-4499 NA Klamath Project, OR-CA. Pumping Plant FF -- 3500 Manitowoc preparing to unload a section of 84" RCP from lowbow (sic). Note TD-20 cat in position to pull lowboy out of trench when load ...
Citation