Search Results
-
P12-200-2791A Klamath River - Klamath Project--Oregon. Employees of M-K Co., under contract with PP&L Co., drilling rock and placing explosive for excavation of 100' X 12' X 3500' channel through Keno ...
Citation -
KP-2435-R2 - ENTERPRISE POWER PLANT - Klamath Project. The forced air fuel oil heater used for concrete protection is shown in foreground; March 11, 1958; Photo by K. J. Greene
Citation -
3. [Image] Lower Cost Canal Lining - A-3 Lateral
KP-2207-R2 - Lower Cost Canal Lining - A-3 Lateral. Klamath Project. Using up the short pieces; April 15, 1953; Bureau of Reclamation Photo by Mark D. Taylor, Jr.Citation -
P12-201-4386 NA Klamath Project, OR-CA. Laborers working on compacted backfill on east side of Pumping Plant EE. Wackers were used on 6" lifts along sides close to structure. Five ton vibratory roller ...
Citation -
KP-1507-R2 - Klamath Project; Using 2" X 4" strike-off, the improvement in the surface, caused by the second pass of the 4" X 6" strike-off, is readily noted above the 2" X 4" strike-off; July 18, 1947; ...
Citation -
KP-1508-R2 - Klamath Project; Using wood bull float after striking off with 2 x 4; Time approximately 1:40 P. M., July 18, 1947; Stacy, contractor; Photo by H. W. Sexton
Citation -
KP-1509-R2 - Klamath Project; Using Fresno float (steel) after bull float; Time approximately 1:44 P. M., July 18, 1947; Stacy, contractor; Photo by H. W. Sexton
Citation -
KP-1511-R2 - Klamath Project. Steel in place, completed panels shown, screeds in place, steel men working. Paper is used to prevent curing compound getting on steel. Man with hose, who wets down subgrade ...
Citation -
P12-200-2910NA Klamath Project - Oregon-California. View of trencher starting to excavate a drain line. The hopper and digging unit are dropped into place at the outlet of the proposed line. Then, the ...
Citation -
10. [Image] Closed Drain Construction - Tule Lake Sump 3 - Specs. No. 200C-842, Patterson Constr. Co., Contractor
P12-200-2917NA Klamath Project - Oregon-California. View of trenching equipment. The trencher is almost at the end of a newly installed closed drain line. Note the workman threading a short section of ...Citation