Search
You searched for:
Start Over
Photos
Remove constraint Photos
Subject
Construction workers
Remove constraint Subject: Construction workers
« Previous | 171 - 180 of 215 | Next »
Search Results
-
171. [Image] Showing method of laying steel
865 Klamath; June 14, [1939?]Citation -
172. [Image] "M" Canal Lining, Station 131, looking Northeast, placing concrete lining with completed panels on each side
KP-1505-R2 - Klamath Project; First pass with a 4" X 6" strike-off, pulled by winch; Time 1:25 P. M., July 18, 1947; Stacy, contractor; Photo by H. W. SextonCitation -
173. [Image] "M" Canal Lining, Station 131, looking Northeast, placing concrete lining with completed panels on each side
KP-1506-R2 - Klamath Project; Filling in the last of the required concrete. The 4" X 6" strike-off is almost to the top on the first pass. Later is was put to the bottom and a vibrator inserted in the ...Citation -
174. [Image] "M" Canal Lining, Station 131, looking Northeast, placing a concrete lining with completed panels on each side
KP-1507-R2 - Klamath Project; Using 2" X 4" strike-off, the improvement in the surface, caused by the second pass of the 4" X 6" strike-off, is readily noted above the 2" X 4" strike-off; July 18, 1947; ...Citation -
175. [Image] "M" Canal Lining, Station 131, looking Northeast - Placing concrete lining with completed panels on each side
KP-1508-R2 - Klamath Project; Using wood bull float after striking off with 2 x 4; Time approximately 1:40 P. M., July 18, 1947; Stacy, contractor; Photo by H. W. SextonCitation -
176. [Image] "M" Canal Lining, Station 131, looking Northeast - Placing concrete lining with completed panels on each side
KP-1509-R2 - Klamath Project; Using Fresno float (steel) after bull float; Time approximately 1:44 P. M., July 18, 1947; Stacy, contractor; Photo by H. W. SextonCitation -
KP-1511-R2 - Klamath Project. Steel in place, completed panels shown, screeds in place, steel men working. Paper is used to prevent curing compound getting on steel. Man with hose, who wets down subgrade ...
Citation -
178. [Image] Closed Drain Construction - Tule Lake Sump 3 – Specs. No. 200C-842, Patterson Construction Company, Contractor
CN-12-201-184NA Klamath Project - Oregon-California. Side view of the hopper unit used to feed both pipe and cinders into the trench. The digging chain for the trencher is mounted directly in front of ...Citation -
179. [Image] Closed Drain Construction - Tule Lake Sump 3 - Specs. No 200C-842, Patterson Constr. Co., Contractor
CN-12-201-202NA Klamath Project - Oregon-California. View of cutoff trench. The trenching machine dug the cutoff wall, but in doing so left a large amount of dirt in the excavated area. It was necessary ...Citation -
180. [Image] Closed Drain Construction - Tule Late Sump 3 – Specs. No. 200C-842, Patterson Constr. Co., Contractor
CN-12-201-207NA Klamath Project - Oregon-California. View of workman in trench; February 1973; Bureau of Reclamation photo by D. W. SteinCitation