121. [Image] KSD Enlargement, Lower Klamath Lake Division, Specs. 200C-922 - Patterson Constr. Co., Contractor
P-12-200-4213NA Klamath Project - Oregon-California. Twenty cu. yd. belly dump spreading load of sub-base material on road area. Laborer spotting dump. View looking north; July 1976; USBR photo by ...Citation -
P12-201-4485 NA Klamath Project, OR-CA. View of PP 'FF' inlet to siphon transition looking from outlet structure west; November 2, 1977; USBR photo by D.J. Kline
Citation -
P12-201-4493 NA Klamath Project, OR-CA. Putting in screeding and 84" RCP in preparation for pipe laying operation; Dec. 2, 1977; USBR photo by D.J. Kline
Citation -
P12-201-4536NA Klamath Project, OR-CA. Plant E Bridge -- RHC personnel drilling out sheared slide bolts from Vulcan No. 1 hammer. Repairs took 14 man hours to complete; March 21, 1978; USBR photo by ...
Citation -
P12-201-4553NA Klamath Project, OR-CA. Pumping Plant E Bridge. Contractor is moving bridge section laterally at this point; April 1978; USBR photo by D.J. Kline
Citation -
P12-201-4563NA Klamath Project, OR-CA. Center Canal Flume Bridge. Torquing the 14" x 3/4" steel bolts connecting the steel sleeve to bottom piling; April 4, 1978; USBR photo by D.J. Kline
Citation -
127. [Image] N-16 Lateral - Lower cost canal lining
KP-1884 - Klamath Project. N-16 Lateral. Lower cost canal lining. Laying of second strip of asphalt membrane with approximately 2-inch overlap. George L. Browning and L. G. Oliensis on far side of ...Citation -
128. [Image] Lower cost canal lining - Dipping of asphalt strips
KP-1891 - Klamath Project. Lower cost canal lining. This shows the dipping process which took the place of painting each side of the asphalt strips with a brush. A. J. Lommasson, instructing. Plant ...Citation -
129. [Image] Lower cost canal lining - Asphalt lining in channel
KP-1892 - Klamath Project. Lower cost canal lining. Heating shack in background. Due to cold weather, asphalt sheets cracked when unrolled, so rolls were put inside building to be kept warm; December ...Citation -
130. [Image] Lower Cost Canal Lining - N-16 Lateral
KP-1904 - Klamath Project. Lower Cost Canal Lining. N-16 Lateral. Between Sta. 84-30 & 84-60, a transition takes place where the regular 10-ft. bottom becomes a 6-ft. bottom. Picture shows also the ...Citation